The core function of the project manager isA . Systems designB . Client interfacingC . Quality assuranceD . integration

题目

The core function of the project manager is

A . Systems design

B . Client interfacing

C . Quality assurance

D . integration


相似考题
参考答案和解析
正确答案:D
更多“The core function of the project manager isA . Systems designB . Client interfacingC . Quality assuranceD . integration”相关问题
  • 第1题:

    Project leadership requires that the project manager pay attention simultaneously to the:

    A . Tasks to be performed and needs of the team

    B . Quantity and quality of the work to be performed

    C . Efficiency and effectiveness of the team

    D . Time, cost and performance deliverables

    E . All of the above


    正确答案:E

  • 第2题:

    Perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:

    A . Coping with employees who report to multiple bosses

    B . Too much sponsorship involvement

    C . Unclear functional understanding of the technical requirements

    D . Escalating project costs

    E . All of the above


    正确答案:A

  • 第3题:

    The major difference between project and line management is that the project manager may not have any control over which basic management function?

    A . Decision-making

    B . Staffing

    C . Rewarding

    D . Tracking/monitoring

    E . Reviewing


    正确答案:B

  • 第4题:

    17 A line manager who is asked to wear two hats and function as a project manager at the same time is likely to exercise:

    A. Authority

    B. Power

    C. Influence

    D. All of the above]

    E. A and B only


    正确答案:D

  • 第5题:

    160 The project manager has, as a prime responsibility, to assure proper integration of activities. In which organizational form. does the project manager probably have the easiest time in integrating work? A. Matrix

    B. Classical

    C. Expediter

    D. Coordinator

    E. Pure project


    正确答案:E

  • 第6题:

    55 The core function of the project manager is

    A. Systems design

    B. Client interfacing

    C. Quality assurance

    D. integration


    正确答案:D

  • 第7题:

    52 The core function of the PM is

    A. client interfacing

    B. project integration

    C. quality assurance

    D. personal administration

    E. All of the above


    正确答案:B

  • 第8题:

    ● Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:

    A The project manager and project office personnel.

    B The project team and functional managers.

    C The project sponsor.

    D All of the above.

    E A and B only.


    正确答案:E

  • 第9题:

    Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.( ) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.

    A.Cost-Benefit analysis
    B.Control charts
    C.Quality function deployment
    D.Cost of quality analysis

    答案:D
    解析:

  • 第10题:

    The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()

    • A、Evaluate phase exit milestones using sufficiency criteria
    • B、Flexible entry and exit criteria to minimize schedule delays
    • C、Quality measures reported only to the project steering committee
    • D、Many work teams with few members to maximize the number of deliverable hand-offs

    正确答案:A

  • 第11题:

    Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()

    • A、Developing key personnel
    • B、Leading technical specialists
    • C、Interfacing with customers / sponsors
    • D、Analyzing skills

    正确答案:C

  • 第12题:

    单选题
    The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
    A

    Evaluate phase exit milestones using sufficiency criteria

    B

    Flexible entry and exit criteria to minimize schedule delays

    C

    Quality measures reported only to the project steering committee

    D

    Many work teams with few members to maximize the number of deliverable hand-offs


    正确答案: D
    解析: 暂无解析

  • 第13题:

    The core function of the PM is

    A . client interfacing

    B . project integration

    C . quality assurance

    D . personal administration

    E . All of the above.


    正确答案:B

  • 第14题:

    The project manager has, as a prime responsibility, to assure proper integration of activities. In which organizational form. does the project manager probably have the easiest time in integrating work?

    A . Matrix

    B . Classical

    C . Expediter

    D . Coordinator

    E . Pure project


    正确答案:E

  • 第15题:

    A line manager who is asked to wear two hats and function as a project manager at the same time is likely to exercise:

    A Authority

    B Power

    C Influence

    D All of the above]

    E A and B only


    正确答案:D

  • 第16题:

    41 In the project environment, the individual ultimately responsible for quality control is:

    A. The line workers who must strive "to do things right the first time" to avoid quality problems. B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.

    C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.

    D. The project manager who has ultimate responsibility for the entire project.

    E.the customer who must ensure that he is receiving a quality product from the vendor


    正确答案:D

  • 第17题:

    175 Quality assurance

    A. refers to the prevention of product defects

    B. is an auditing function that provides feedback to the project team and client about the quality of output being produced.

    C. is the technical process that include the construction of control charts which specify acceptability limits for conforming output.

    D. A and B.

    E. B and C


    正确答案:B

  • 第18题:

    99 A line manager who is asked to wear two hats and function as a project manager at the same time is likely to exercise:

    A. Authority

    B. Power

    C. Influence

    D. All of the above

    E. A and B only


    正确答案:D

  • 第19题:

    69 The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

    A. budget, schedule

    B. quality requirements, schedule

    C. size, type of industry

    D. nature, size

    E. project manager, sponsor


    正确答案:D

  • 第20题:

    The auditing function that provides feedback about the quality of output is referred to as( ).

    A.quality control
    B.quality planning
    C.quality assurance
    D.quality improvement

    答案:C
    解析:
    翻译:审计功能能够反馈产品质量,它是质量保证的工具。A.质量控制 B.质量计划 C.质量保证 D.质量改进

  • 第21题:

    Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance. () is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.

    A.Cost-Benefit
    B.Control charts
    C.Quality function deployment
    D.Cost of quality analysis

    答案:D
    解析:
    质量分析成本(Cost of quality analysis)是对产品或服务进行需求一致性分析所产生的成本;成本效益分析(Cost-Benefit analysis)是通过比较项目的全部成本和效益来评估项目价值的一种方法;控制图(Control charts )是项目质量控制方法;质量功能展开(Quality function deployment)是把顾客或市场的要求转化为设计要求、零部件特性、工艺要求、生产要求的多层次演绎分析方法。因此选D。

  • 第22题:

    Which of the following procedure should be performed prior to delivery and generally involves running a suite of operations so as to verify that the solution is applicable for production?()

    • A、Security Check
    • B、Acceptance Testing
    • C、Project Close Out
    • D、Systems Integration

    正确答案:B

  • 第23题:

    What is a reason for reviewing the user requirements document with the client?()

    • A、To gain the client’s acceptance of the detailed design
    • B、To verify mutual understanding of project resources
    • C、To verify mutual understanding of the detailed project plan
    • D、To verify mutual understanding of targeted product performance
    • E、To verify mutual understanding of the tests that will be done after the product is completed

    正确答案:D