Typical characteristics of a work package include:ARepresentation of units of work at a level where work is performedBClearly distinguishes one work package from all others assigned to a single functional groupCLimits the work to be performed to relativel

题目

Typical characteristics of a work package include:

ARepresentation of units of work at a level where work is performed

BClearly distinguishes one work package from all others assigned to a single functional group

CLimits the work to be performed to relatively short periods of time

DAll of the above

EA and B only


相似考题
参考答案和解析
正确答案:E
E
更多“Typical characteristics of a work package include:ARepresentation of units of work at a level where work is performedBClearly distinguishes one work package from all others assigned to a single functional groupCLimits the work to be performed to relativel”相关问题
  • 第1题:

    The Cost Performance Index (CPI) measures:

    A.cost of work performed vs planned costs.

    B.work performed vs cost of work performed.

    C.work performed vs planned work.

    D.direct costs vs indirect costs.

    E.floating costs vs. sunk costs.


    正确答案:B

    B

  • 第2题:

    96 A task-oriented family tree of activities is a:

    A. Detailed plan.

    B. Linear responsibility chart.

    C. Work breakdown structure.

    D. Cost account coding system.

    E. Work package description.


    正确答案:C

  • 第3题:

    115 Typical characteristics of a work package include:

    A. Representation of units of work at a level where work is performed

    B. Clearly distinguishes one work package from all others assigned to a single functional group C. Limits the work to be performed to relatively short periods of time

    D. All of the above

    E. A and B only


    正确答案:E

  • 第4题:

    68 The Cost Performance Index (CPI) measures:

    A. cost of work performed vs planned costs.

    B. work performed vs cost of work performed.

    C. work performed vs planned work.

    D. direct costs vs indirect costs.

    E. floating costs vs. sunk costs.


    正确答案:B

  • 第5题:

    148 Work packages are used to:

    A. Represent units of work at a level where work is performed.

    B. Clearly distinguish one work package from all others assigned to a single functional group.

    C. Limit the work to be performed to relatively short periods of time.

    D. All of the above.

    E. A and B only


    正确答案:D

  • 第6题:

    对一个风险事件的临时应对措施叫做:( )

    A.工作项(work item)

    B.工作包(work package)

    C.权变措施(workaround)

    D.工作分解结构(work breakdown structure)


    正确答案:C
    权变措施(workaround)是指为了应对那些事先没有识别出的或者是已经接受的风险而采取的临时应对措施。

  • 第7题:

    ● Typical characteristics of a work package include:

    A Representation of units of work at a level where work is performed

    B Clearly distinguishes one work package from all others assigned to a single functional group

    C Limits the work to be performed to relatively short periods of time

    D All of the above

    E A and B only


    正确答案:E

  • 第8题:

    ● Using the WBS in the Special window, an instance of a work package is:

    A Build house

    B Excavate

    C Prepare Foundation

    D B and C

    E None of the above


    正确答案:E

  • 第9题:

    ● Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the (75) level.

    (75)

    A.independent resource

    B.individual work load

    C.work milestone

    D.work package


    正确答案:D
    试题(75)分析
     WBS工作分解结构是面向可交付物的层次性分析结构,是对完成项目目标、创造可交付物所需执行的项目工作的分解。WBS把项目工作细分为更小、更易管理的工作单元,随着WBS层次的降低,意味着项目工作也越来越详细,直到工作包work package的层次。
     独立资源independent resource、个人工作负荷individual work load以及工作里程碑work milestone都不是WBS分解的最小层级,因此选D。
    参考答案
    (75)D

  • 第10题:

    Define Activities is the process of identifying the specific actions to be performed to produce the ( ) .

    A.project elements
    B.work drafts
    C.work package
    D.project deliverables

    答案:D
    解析:

  • 第11题:

    Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the ( ) level.

    A.independent resource
    B.individual work load
    C.work milestone
    D.work package

    答案:D
    解析:
    WBS(工作分解结构)是面向可交付物的层次性分析结构,是对完成项目目标、创造可交付物所需执行的项目工作的分解。WBS把项目工作细分为更小、更易管理的工作单元,随着WBS层次的降低,意味着项目工作也越来越详细,直到工作包(work package)的层次。A. 独立资源 B. 个人工作负荷C. 工作里程碑 D. 工作包

  • 第12题:

    单选题
    The master shall ensure that any seafarers()are provided with an adequate period of rest.
    A

    who have performed work for 14 hours

    B

    who have performed work in a scheduled rest period

    C

    who have performed work in a scheduled work period

    D

    who works hard


    正确答案: C
    解析: 暂无解析

  • 第13题:

    The Cost Performance Index is computed as:

    A . budget cost of work performed divided by actual cost of work performed

    B . budget cost of work performed minus actual cost of work performed

    C . budget cost of work performed minus budget cost of work scheduled

    D . budget cost of work scheduled divided by budget cost of work performed

    E . actual cost of work scheduled divided by budget cost of work performed


    正确答案:A

  • 第14题:

    114 The Cost Performance Index is computed as:

    A. budget cost of work performed divided by actual cost of work performed

    B. budget cost of work performed minus actual cost of work performed

    C. budget cost of work performed minus budget cost of work scheduled

    D. budget cost of work scheduled divided by budget cost of work performed

    E. actual cost of work scheduled divided by budget cost of work performed


    正确答案:A

  • 第15题:

    63 When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at the

    A. task

    B. level of effort

    C. sub-task

    D. project

    E. work package


    正确答案:E

  • 第16题:

    133 Using the WBS shown in the Special window, a typical work package would be:

    A. Software development

    B. Systems design

    C. Coding

    D. A, B, and C

    E. None of the above


    正确答案:E

  • 第17题:

    ● When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at the

    A task

    B level of effort

    C sub-task

    D project

    E work package


    正确答案:E

  • 第18题:

    ● Using the WBS shown in the Special window, a typical work package would be:

    A Software development

    B Systems design

    C Coding

    D A, B, and C

    E None of the above.


    正确答案:E

  • 第19题:

    ● A task-oriented family tree of activities is a:

    A Detailed plan.

    B Linear responsibility chart.

    C Work breakdown structure.

    D Cost account coding system.

    E Work package description.


    正确答案:C

  • 第20题:

    ● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.

    A.Process

    B.Milestone

    C.Work D.

    Deliverables


    正确答案:D

  • 第21题:

    ( )is the sum of all budgets established for the work to be performed.

    A.CPI
    B.BAC
    C.SPI
    D.EAC

    答案:B
    解析:
    完工预算(总预算BAC)是为将要执行的工作建立的所有预算的总和。

  • 第22题:

    Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the ( ) level.

    A.independent resource
    B.individual work loaD.
    C.work milestone
    D.work package

    答案:D
    解析:
    WBS(工作分解结构)是面向可交付物的层次性分析结构,是对完成项目目标、创造可交付物所需执行的项目工作的分解。WBS把项目工作细分为更小、更易管理的工作单元,随着WBS层次的降低,意味着项目工作也越来越详细,直到工作包(work package)的层次。
    (75) A.独立资源 B.个人工作负荷 C.工作里程碑 D.工作包

  • 第23题:

    哪些相关work units(工时单位)描述是错的?()

    • A、操作文本和work units让客户,车间及戴姆勒股份公司沟通更容易
    • B、Work units仅满足保修工作的需要
    • C、一个work units对应到5分钟;12个work units是1小时
    • D、Work units历来细分为基本时间和津贴补偿时间
    • E、领取到维修工单和车辆移动不包括在work units中

    正确答案:B,E