55 The most precise or accurate estimate for determining project costs is the _____ estimate. A. Definitive.
B. Analogy
C. Budget
D. Modified standards.
E. Rule of thumb
第1题:
Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A . Overhead rates, labor rates and material costs.
B . Overhead rates, schedule slippages, and rework.
C . Rework, cost-of-living adjustments, and overtime.
D . Material costs, shipping cost, and scope changes.
E . Labor rates, material costs, and cost reporting.
第2题:
173 The most precise or accurate estimate for determining project costs is the _____ estimate. A. Definitive.
B. Analogy
C. Budget
D. Modified standards.
E. Rule of thumb
第3题:
198 The most effective means of determining the cost of a project is to price out the _____.
A. Work breakdown structure.
B. Linear responsibility chart.
C. Project charter.
D. Scope statement.
E. Management plan
第4题:
1 Contingency planning should include all but which of the following?
A. The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.
B the development of schedule alternatives and work-around
C. the management of a contingency budget
D. an assessment of project shut-down liabilities.
E. A and C
第5题:
89 A Work Berakdown Structure is most useful for:
A. Identifying individual tasks for a project.
B. Scheduling the start of tasks.
C. Developing a cost estimate.
D. Determining potential delays.
E. A and C
第6题:
The most accurate method of determining gyrocompass error while underway is by ______.
A.Comparing the gyro azimuth of a celestial body with the computed azimuth of the body
B.Comparing the gyro heading with the magnetic compass heading
C.Determining from the chart the course made good between celestial fixes
D.It cannot be determined accurately at sea due to drift of unknown currents
第7题:
第8题:
第9题:
第10题:
As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()
第11题:
The project manager performs all estimates
Incorporate each individual worker’s estimates
Acquire expert estimates
There is no way to determine the duration
第12题:
Comparing the gyro azimuth of a celestial body with the computed azimuth of the body
Comparing the gyro heading with the magnetic compass heading
Determining from the chart the course made good between celestial fixes
It cannot be determined accurately at sea due to drift of unknown currents
第13题:
144 Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A. Overhead rates, labor rates and material costs.
B. Overhead rates, schedule slippages, and rework.
C. Rework, cost-of-living adjustments, and overtime.
D. Material costs, shipping cost, and scope changes.
E. Labor rates, material costs, and cost reporting
第14题:
177 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).
A. Parametric
B. Definitive.
C. Budget
D. Bottom up. E
. Top down
第15题:
19 It is argumentative whether project managers actually control costs. Which of the following is the most common element over which the project manager may have some degree of control?
A. Direct labor dollars
B. Direct labor hours.
C. Overhead rates.
D. Procurement costs.
E. None of the above
第16题:
59 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).
A. Parametric
B. Definitive.
C. Budget
D. Bottom up.
E. Top down
第17题:
● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .
(72)
A.identifying individual tasks for a project
B.scheduling the start of tasks
C.scheduling the end of tasks
D.determining potential delays
第18题:
第19题:
第20题:
第21题:
What is the MOST accurate way to determine a project’s duration before execution?()
第22题:
If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()
第23题:
The high level budget estimates are inaccurate
The organizational spending plan is inaccurate
The budget is not aligned with the spending plan of the organization
The detailed bottom up budget will need to be adjusted