64 The financial closeout of a project dictates that:
A. All project funds have been spent.
B. No charge numbers have been overrun.
C. No follow-on work from this client is possible.
D. No further charges can be made against the project.
E. All of the above
第1题:
You have summarized the project and note that , hours have been scheduled, , hours have been earned and , hours paid. The correct conclusion is:
A.The project is operating at a favorable cost efficiency ratio.
B.the project is spending more than planned
C.the project is behind schedule
D.the project is ahead of schedule
E.B and C
第2题:
35 The project charter:
A. Expresses upper management commitment to the project.
B. Provides that authority by which the project will be run.
C. Establishes that organizational structure with the project.
D. Specifies overall objectives and timeframe. of the project.
E. All of the above
第3题:
167 The project life-cycle can be described as:
A. project concept, project planning, project execution, and project close-out.
B. project planning, work authorization, and project reporting.
C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.
E. All of the above
第4题:
193 Creation of project objectives:
A. allows for data collection and analysis and progress reporting against which standards of performance can be measured.
B. is accomplished by selection of measurable variables against which performance can be judged. C. is required before funding of the project by the project sponsor.
D. all of the above.
E. A and B only
第5题:
185 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above
第6题:
86 A work breakdown structure:
A. assures all work is identified.
B. subdivides the project into manageable segments.
C. provides the project sponsor with a time-phase task summary.
D. both A and B.
E. All of the above
第7题:
168 A work breakdown structure:
A. assures all work is identified.
B. subdivides the project into manageable segments.
C. provides the project sponsor with a time-phase task summary.
D. both A and B.
E. All of the above.
第8题:
● Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
A The project manager
B The functional manager
C The project sponsor
D The client
E All of the above
第9题:
● The financial closeout of a project dictates that:
A All project funds have been spent.
B No charge numbers have been overrun.
C No follow-on work from this client is possible.
D No further charges can be made against the project.
E All of the above.
第10题:
Free pratique means that ______.
A.clearance requirements for all regulatory bodies have been met
B.health requirements have been met and no further quarantine formalities are required
C.shipment will be made at no cost
D.tonnage taxes are not required to be paid
第11题:
not be started
will not be started
is not started
is not to be started
第12题:
not be started
will not be started
is not started
is not to be started
第13题:
182 The financial closeout of a project dictates that:
A. All project funds have been spent.
B. No charge numbers have been overrun.
C. No follow-on work from this client is possible.
D. No further charges can be made against the project.
E. All of the above
第14题:
154 A Work Breakdown Structure:
A. assures all work is identified
B. subdivides the project into manageable segments
C. provides the project sponsor with a time-phase task summary
D. both A and B
E. All of the above
第15题:
171 Documented work authorization provide:
A. a means of effective internal coordination of the project's activities.
B. an audit trail of all work authorized from project initiation to completion
C.a means for communication of work activity between the project manager and the performing activities.
D. All of the above
E. A and B only
第16题:
142 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
A. The project manager
B. The functional manager
C. The project sponsor
D. The client
E. All of the above
第17题:
39 You have summarized the project and note that 28,000 hours have been scheduled, 25,000 hours have been earned and 26,000 hours paid. The correct conclusion is:
A. The project is operating at a favorable cost efficiency ratio.
B. the project is spending more than planned
C. the project is behind schedule
D. the project is ahead of schedule
E. B and C
第18题:
67 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above.
第19题:
● The scope of a project can be expected to change if:
A The project manager must provide cost estimates without having a design concept
B Oversimplification (underestimating) of the nature of the work occurs
C The project manager is assigned after the project is defined, and the cost and schedule are approved
D A clear objective is not provided
E All of the above are possible based upon the situation
第20题:
● A Work Breakdown Structure:
A assures all work is identified
B subdivides the project into manageable segments
C provides the project sponsor with a time-phase task summary
D both A and B
E All of the above.
第21题:
A.All that...has
B.All that...have
C.All...has
D.All...have
第22题:
第23题:
clearance requirements for all regulatory bodies have been met
health requirements have been met and no further quarantine formalities are required
shipment will be made at no cost