The road runs________the railway.
A、parallel in
B、parallel to
C、parallel with
D、parallel on
第1题:
A.Coaxial(同轴电缆)
B.Ribbon
C.UTP
D.Parallel(并口)
第2题:
第3题:
MySQL 5.7中基于组提交的并行复制如何设置
A.slave-parallel-type 设置为DATABASE
B.slave-parallel-type 设置为LOGICAL_CLOCK
C.master-parallel-type 设置为DATABASE
D.master-parallel-type 设置为LOGICAL_CLOCK
第4题:
● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.
(75)
A. Waterfall
B. Phased
C. Prototyping
D. Parallel
第5题:
Parallel类,是并行执行任务类的实用类
第6题:
13、因为Score1数组、Score2数组和Score3数组的大小相同,并且相应元素包含相关数据,所以它们叫做平行(parallel)数组。 Because Score1, Score2 and Score3 are of the same size and the corresponding elements contain relevant data, they are called parallel arrays.