● Risk management allows the project manager and the project team not to(71).(71)A.eliminate most risks during the planning phase of the projectB.identify project risksC.identify impacts of various risksD.plan suitable responses

题目

● Risk management allows the project manager and the project team not to(71).

(71)

A.eliminate most risks during the planning phase of the project

B.identify project risks

C.identify impacts of various risks

D.plan suitable responses


相似考题
更多“● Risk management allows the project manager and the project team not to(71). (71)A.elimin ”相关问题
  • 第1题:

    Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.

    A.risk

    B.problem

    C.result

    D.data


    正确答案:A
    风险是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A是风险,选项B是问题,选项C是结果,选项D是数据。根据项目风险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择A。

  • 第2题:

    中国青少年发展基金会在网上的主页地址是()。

    A.http://project-hopE.cydF.gov.cn

    B.http://project-hopE.cydF.ac

    C.http://project-hopE.cydF.edu.cn

    D.http://project-hopE.cydF.com.cn


    参考答案:C

  • 第3题:

    在对原理图进行电气规则检查前,可以()打开规则设置界面。

    A.design-Document Options

    B.Project-Project Options

    C.Tools-Schematic Preferences

    D.Project-Configuration Manager


    Project-Project Options

  • 第4题:

    Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

    A.Integration

    B.Configuration

    C.Scope

    D.Requirement


    正确答案:C

  • 第5题:

    执行菜单命令(),系统开始对项目进行编译,并生成信息报告

    A.project/compile PCB project

    B.project/project option

    C.Design/netlist/protel

    D.design/make project library


    D

  • 第6题:

    以下选项中哪个选项是根路径的表达方法?

    A.D:/Program Files/.Net/Project1

    B./root/.Net/Project1

    C../home/.Net/Project1

    D.file://D:/Program Files/.Net/Project1


    root/.Net/Project1