Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Proj

题目

Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Project Integration Management.

A.Developing project charter

B.Developing project management plan

C.Analyzing project risks

D.Monitoring and controlling project


相似考题
更多“Project Integration Management includes the processes and activities to identify, define, ”相关问题
  • 第1题:

    An individual bird can ________ the call of its own species.

    A.indicate

    B.differ

    C.realize

    D.identify


    参考答案:D

  • 第2题:

    Itisimpossibleto___themanamongsomanypeople.

    A.figureout

    B.pointout

    C.remind

    D.identify


    正确答案:D

  • 第3题:

    Refer to Topic TestKing.com in iPAD document.What happens to the network when TestKingX is reconnected and a trunk exists between the two switches?()

    A. All VLANs except the default VLAN will be removed from all switches.

    B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.

    C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.

    D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.


    参考答案:D

  • 第4题:

    Logistics means systematic management of()activities.

    A、variety

    B、vary

    C、various


    参考答案:C

  • 第5题:

    Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

    A.Integration

    B.Configuration

    C.Scope

    D.Requirement


    正确答案:C

  • 第6题:

    Louis was asked to name the man who stole her purse.

    A:confirm
    B:recognize
    C:claim
    D:identify

    答案:D
    解析:
    路易斯被要求去识别偷了他钱包的人。confirm“证实”,例如:Before you confirm design of this products , you should research the market carefully.在确定该产品的设计方案之前,你需要仔细研究一下市场。recognize“承认、认出”,例如:At that instant she did not recognize the man that had kidnapped her.在那一瞬间,她没有认出绑架她的人:claim:宣称,例如:He claimed that he had done the work without help.他宣称完成这个工作没让别人帮助。 identify“识别、鉴定”,最符合题意,例如:We must also identify and nurture new talent.我们也必须识别和培养新的人才。