● Project Quality Management processes include all the activities of the (71) that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.
(71)
A. project
B. project management team
C. performing organization
D. customer
第1题:
● Virtualization is an approach to IT that pools and shares (71) so that utilization is optimized and supplies automatically meet demand. Traditional IT environments are often silos, where both technology and human (72) are aligned around an application or business function. With a virtualized (73) , people, processes, and technology are focused on meeting service levels, (74 ) is allocated dynamically, resources are optimized, and the entire infrastructure is simplified and flexible. We offer a broad spectrum of virtualization (75) that allows customers to choose the most appropriate path and optimization focus for their IT infrastructure resources.
(71)A. advantages B. resources C. benefits D. precedents
(72)A. profits B. costs C. resources D. powers
(73)A. system B. infrastructure C. hardware D. link
(74)A. content B. position C. power D. capacity
(75)A. solutions B. networks C. interfaces D. connections
第2题:
The data station usually means a(71)unit that provides data for transmission, that accepts transmitted data, and that performs all functions necessary for communication with another functional unit. Data stations may be divided into two kinds, the primary stations and the secondary stations, (72)control functions.In(73)data link control, the primary station is the data station that supports the primary control functions of the data link, generates commands to be transmitted, and interprets received responses. Specific responsibilities assigned to the primary station include initialization of control signal interchange, organization of data flow and actions regarding error control and error recovery functions. The secondary station executes data link control functions as (74)by the primary station, interprets received commands and (75) responses to be transmitted.
A.performance
B.functional
C.capacity
D.quality
第3题:
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
A.risk
B.problem
C.result
D.data
第4题:
SeethebuildinstructionsformanagingCoherenceviaJMXandputthestepsinorder.
()
1.Updateset-env.cmd(orset-env.shifyouarebuildingonUNIX)toreflectyoursystemenvironment.
2.Openacommandshellandexecuteset-env.cmd(orsourceset-env.shifyouarebuildingonUNIX)
3.Runantbuild.
4.Deploythejmx-console.warfilefoundunderthebuilddirectorytoyourapplicationserver.BesuretostartyourapplicationserverJVMwiththenecessaryCoherence
ManagementFrameworkoverrides.Forexample:-Dtangosol.coherence.management=all
5.Toremovebuildartifactsfromyourfilesystem,run’antclean’
第5题:
Virtualization is an approach to IT that pools and shares(71)so that utilization is optimized and supplies automatically meet demand. Traditional IT environments are often silos, where both technology and human(72)are aligned around an application or business function. With a virtualized(73), people, processes, and technology are focused on meeting service levels,(74)is allocated dynamically, resources are optimized, and the entire infrastructure is simplified and flexible. We offer a broad spectrum of virtualization(75)that allows customers to choose the most appropriate path and optimization focus for their IT infrastructure resources.
A.advantages
B.resources
C.benefits
D.precedents
第6题:
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.
A.Integration
B.Configuration
C.Scope
D.Requirement