The project maintains a current and approved set of requirements over the life of the project by doing the following: .(73)all changes to the requirements . Maintaining the relationships among the requirements, the project plans, and the work products . ……
A.Monitoring
B.Managing
C.Gathering
D.Reducing
第1题:
A negative cost variance and positive schedule variance means:
A The project is under budget and ahead of schedule
B The project is over budget and behind schedule
C The project is over budget and ahead of schedule
D The project will be overrun but ahead of schedule at completion
第2题:
174 A project may be defined as _____
A. an integrated approach to managing projects
B. a coordinated undertaking of interrelated activities.
C. a group of activities directed by a project manger over a life cycle
D. an undertaking with a defined starting point and defined objectives
E. All of the above
第3题:
96 A negative cost variance and positive schedule variance means:
A. The project is under budget and ahead of schedule
B. The project is over budget and behind schedule
C. The project is over budget and ahead of schedule
D. The project will be overrun but ahead of schedule at completion
第4题:
67 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above.
第5题:
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
A.phases
B.processes
C.segments
D.pieces
第6题:
● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.
(75)
A.Cost-Benefit analysis
B.Control charts
C.Quality function deployment
D.Cost of quality analysis
第7题:
If the approved change requests have an effect on the project scope, then the corresponding component documents and cost baselines, and( ) of the project management plan. Are revised and reissued to reflect the approved changes
A.developing baselines
B.testing baselines
C.schedule baselines
D.ending baselines
第8题:
第9题:
第10题:
第11题:
current life table
第12题:
one approved flotation cushion for each person on board
one approved life preserver for each person on board and one life ring
one approved inflatable vest for each person on board
lifeboat capacity equal to 1 1/2 times the number of persons on board
第13题:
121 The quality objectives are approved in the conceptual stage of the project by the:
A. Project Engineer
B. Project Manager
C. Functional Manager
D. Quality Assurance Manager
E. Project Owner
第14题:
185 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above
第15题:
A.reviewing
B.estimating
C.auditing
D.expecting
该题的关键词为"scheduling、executing、monitoring、controlling",其语句结构为‘‘Project work packages(主语)are typically decomposed into(谓语)smaller components",含义为"项目工作包通常被分解为更小的活动",分析后得知空白处的选项应该和上述的关键词为并列的词语,且顺序排列在其他的关键词之前,因而只能选择选项B,因为只有首先进行项目估算,才能制定项目进度,然后才能执行和监控,其他选项不符合题意。
第16题:
● The project maintains a current and approved set of requirements ovethe life of the project by doing the following:
· (73) all changes to the requirements
· Maintaining the relationships among the requirements, the project plansand the work products
· ……
(73)
A. Monitoring
B. Managing
C. Gathering
D. Reducin
第17题:
A、good
B、best
C、better
第18题:
Plan Quality is the process of identifying quality requirements and standards for the project and product and documenting how the project will demonstrate compliance ______ is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement and failing to meet requirements.
A.Cost-Benefit analysis
B.Control charts
C.Quality function deployment
D.Cost of quality analysis
第19题:
第20题:
第21题:
第22题:
第23题:
reviewing
estimating
auditing
expecting