The process of translating the qualitymangement plan into executable quality activities that incorporate theorganization's quality policies into the project.A.Manage qualityB.Quality auditC.Quality metricsD.Quality improvement

题目

The process of translating the qualitymangement plan into executable quality activities that incorporate theorganization's quality policies into the project.

A.Manage quality

B.Quality audit

C.Quality metrics

D.Quality improvement


相似考题
参考答案和解析
正确答案:A
更多“The process of translating the qualitymangement plan into executable quality activities th ”相关问题
  • 第1题:

    2 The Work Breakdown Structure (WBS) is the basis for communicating:

    A. Project scope, cost control, schedule, quality

    B. Project objectives, dependencies, plan, cost control

    C. Project scope, schedule, staffing, cost control

    D. Project scope, quality, schedule, dependencies

    E. Project budget, schedule, risk factors, work assignments


    正确答案:A

  • 第2题:

    ● The Work Breakdown Structure (WBS) is the basis for communicating:

    A Project scope, cost control, schedule, quality

    B Project objectives, dependencies, plan, cost control

    C Project scope, schedule, staffing, cost control

    D Project scope, quality, schedule, dependencies

    E Project budget, schedule, risk factors, work assignments.


    正确答案:A

  • 第3题:

    Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()

    A. Prepare, Plan, Create, Implement, Operate, and Improve

    B. Prepare, Plan, Design, Implement, Operate, and Optimize

    C. Prepare, Plan, Design, Apply, Operate, and Manage

    D. Prepare, Plan, Design, Implement, Operate and Manage


    参考答案:B

  • 第4题:

    195 The basic terminology for networks includes:

    A. Activities, events, manpower, skill levels and slack.

    B. Activities, documentation, events, manpower and skill levels.

    C. Slack, activities, events, and time estimates.

    D. Time estimates, slack, sponsorship involvement, and activities.

    E. Time estimates, slack time, report writing, life cycle phases, and crashing times


    正确答案:C

  • 第5题:

    戴明循环执行顺序,下面哪项正确?

    A、.PLAN-ACT-DO-CHECK

    B、CHECK-PLAN-ACT-DO

    C、PLAN-DO-CHECK-ACT

    D、ACT-PLAN-CHECK-DO


    答案:C

  • 第6题:

    请将正确答案填在第29处

    A.reading

    B.writing

    C.editing

    D.translating


    正确答案:A
    此处指读书,因此用reading a book。而write“写”;edit“编辑”;translate“翻译”,都不合题意和搭配,故选A。