A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()
A. You must set each end of the trunk line to IEEE 802.1e encapsulation.
B. You must set the same VTP management domain name on both switches.
C. You must set all ports on the two switches as access ports.
D. You must configure one of the switches as a VTP server.
E. You must use a rollover cable to connect the two switches.
第1题:
Certkiller .com has a server named Certkiller -SR05 that has numerous processors installed.You have been given the task of developing an application that displays certain clock speed statisticson all processors installed on Certkiller -SR05.You need to ensure that this requirement is fully satisfied.What should you do?()
A.
B.
C.
D.
第2题:
Have you installed the new software?()
AInstalled.
BUninstalled.
CNo, not yet.
DYes, not yet.
第3题:
While designing your database, you have created the EMPLOYEES table as an index/x7forganized table (IOT). You want to create a bitmap index on the JOB_ID column to make queries faster. Which task must have been completed so that you are able to create the bitmap index?()
第4题:
In which of the following scenarios would the "show cdp neighbors detail"command be an appropriate troubleshooting tool?()
第5题:
You have a computer that runs Windows XP Professional Service Pack 2 (SP2). You need to configure the computer so that Windows updates are downloaded nightly. You must prevent the updates from being installed automatically. What should you do?()
第6题:
You have just created a new VLAN on your network. What is one step that you should include in your VLAN-based implementation and verification plan? ()
第7题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第8题:
While designing your database, you have created the EMPLOYEEStable as an index-organized (IOT). You want to create a bitmap index on the JOD_IDcolumn to make queries faster. Which task must have been completed so that you are able to create the bitmap index?()
第9题:
generic router and switch configuration parameters
end-to-end test plan after all components have been installed and configured
administrator assignments
rollback plan
第10题:
Add the finance users to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Then add the financeGG group to the financeData group to which the necessary permissions have been assigned.
Add the finance users to the financeGG group. Add the financeGG group to the financeUG group to the financeDat group to which the necessary permissions have been assigned.
第11题:
A primary key must have been created.
A mapping table must have been created.
An overflow tablespace must have been specified.
The PCTTHRESHOLD option must have been specified.
第12题:
SVI interface
Access port
EtherChannel port channel
Loopback interface
Routed port
BVI interface
第13题:
第14题:
Have you installed the new software?()
第15题:
A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down. What might explain what happened? ()
第16题:
You have been assigned to manage a set of databases. The previous DBA did not leave you notes regarding the structure of each of the databases. While analyzing an instance, you notice that the system identifier (SID) for the instance is set to ’+ASM’. What is the purpose of this instance?()
第17题:
You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure it to be installed in a high availability network. On a 3560 EMI switch, which three types of interfaces can be used to configure HSRP?()
第18题:
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
第19题:
You have been tasked with performing an update to the IDP attack database. Which three requirements areincluded as part of this task?()
第20题:
The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.
第21题:
You must set each end of the trunk line to IEEE 802.1e encapsulation.
You must set the same VTP management domain name on both switches.
You must set all ports on the two switches as access ports.
You must configure one of the switches as a VTP server.
You must use a rollover cable to connect the two switches.
第22题:
This instance is being used to manage the operating system files.
This instance is being used to manage the files of other databases.
This instance is being used to manage the instances of other databases.
This instance is being used to manage the background processes of other instances.
第23题:
Verify that different native VLANs exist between two switches for security purposes.
Verify that the switch is configured to allow for trunking on the switch ports.
Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
Verify that the VLAN virtual interface has been correctly created and enabled.
第24题:
The SetupUser profile
The Default User profile
The Administrator profile
The System profile
The All Users profile