A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network.Which of the conditions below have to be met in order for this to occur?()
A. The switch that will share the VLAN information must be in the VTP Server mode.
B. The switches must be in the same VTP domain.
C. The switch that will share the VLAN information must be configured as the root bridge.
D. The switches must be configured to use the same VTP version.
E. The switches must be configured to use the same STP version.
F. The switches must be configured to use the same type of ID tagging.
G. The switches must be connected over VLAN trunks.
第1题:
An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()
A. Straight-through cable is used to connect both switches
B. Loopback plug is connected
C. Crossover cable is used to connect both switches
D. Cable is a rollover cable
第2题:
A switch is configured with all ports assigned to vlan 2 with full duplex FastEthernet to segment existing departmental traffic. What is the effect of adding switch ports to a new VLAN on the switch?()
第3题:
A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down. What might explain what happened? ()
第4题:
You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure it to be installed in a high availability network. On a 3560 EMI switch, which three types of interfaces can be used to configure HSRP?()
第5题:
You have just created a new VLAN on your network. What is one step that you should include in your VLAN-based implementation and verification plan? ()
第6题:
Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()
第7题:
A network administrator is explaining VTP configuration to a new technician. What should the network administrator tell the new technician about VTP configuration?()
第8题:
An administrator replaced a router with a switch. End users are able to access network shares butare not able to access the Internet. Which of the following is the BEST explanation why the usersare unable to access the Internet?()
第9题:
An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()
第10题:
The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.
第11题:
Verify that different native VLANs exist between two switches for security purposes.
Verify that the VLAN was added on all switches with the use of the show vlan command.
Verify that the switch is configured to allow for trunking on the switch ports.
Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
第12题:
The switch must be configured with an IP address,subnet mask,and default gateway.
The switch must be connected to a router over a VLAN trunk.
The switch must be reachable through a port connected to its management VLAN.
The switch console port must be connected to the Ethernet LAN.
The switch management VLAN must be created and have a membership of at least one switch port.
The switch must be fully configured as an SNMP agent.
第13题:
A.The Router1 WAN port is configured as a trunking port.
B.The Router1 port connected to Switch1 is configured using subinterfaces.
C.The Router1 port connected to Switch1 is configured as 10 Mbps.
D.The Switch1 port connected to Router1 is configured as a trunking port.
E.The Switch1 port connected to Host B is configured as an access port.
F.The Switch1 port connected to Hub1 is configured as full duplex.
第14题:
Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()
第15题:
You work as a network Technician. A new workstation has consistently been unable to obtain anIP address from the DHCP server when the workstation boots. Older workstations function normally, and the new workstation obtains an address when manually forced to renew its address. What should be configured on the switch to allow the workstation to obtain an IP address at boot?()
第16题:
An administrator would like to configure a switch over a virtual terminal connection from locations outside of the local LAN. Which of the following are required in order for the switch to be configured from a remote location? ()
第17题:
You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()
第18题:
A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()
第19题:
You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()
第20题:
A user is unable to connect to the network. A network technician is able to determine that there is a problem on the switch. All other users on that switch are able to connect successfully to the network. Which of the following is a probable cause?()
第21题:
The switch name must match the workgroup name of the local network.
The switch must be configured with an IP address and default gateway.
The remote workstations must have access to the management VLAN of the switch.
CDP must be enabled on the switch so that it can be located by other devices on the network.
第22题:
MAC filtering
IP address
PoE
Port speed
第23题:
SVI interface
Access port
EtherChannel port channel
Loopback interface
Routed port
BVI interface
第24题:
At Least one enabled switch port that is unconnected to any device
A PC pre-configured with a specific IP Address and Mask
A PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabled
Physical Access to Switch
A Switch with no connected devices