A. TE1
B. TE2
C. TA
D. NT1
E. NT2
第1题:
TestKing.com is configuring the serial interface of a Cisco router to connect to the router of a new ISP. A full T1 is being used for the Internet connection. After issuing the show interface serial 0/0 command, it is observed that the interface is UP and the line protocol is DOWN.Which of the following commands could fix this problem?()
A. Border# copy running-config startup-config
B. Border(config)# no shutdown
C. Border(config-if)# encapsulation ppp
D. Border(config-if)# no cdp enable
E. Border(config-if)# ip routing
第2题:
A.Router John uses alink-state routing protocol.
B.Router John will receive routing updates on the Serial0/0 interface.
C.Router John will receive routing updates on the Serial0/1 interface.
D.Router John will send routing updates out the Serial0/0 interface.
E.Router John will send routing updates out the FastEthernet0/0 interface.
F.Router John will send routing updates out the Serial0/1 interface.
第3题:
A network administrator needs to configure a serial link between the main office and a remote location. The router at the remote office is a non-Cisco router.How should the network administrator configure the serial interface of the main office router to make the connection?()
A.
B.
C.
D.
第4题:
Which command can be used to determine the type of cable attached to the Serial 0/0 interface on a router?()
第5题:
You have just obtained a modular Cisco router with 2 serial connections and a BRI/U interface. What other physical piece of hardware is required in order to establish an ISDN connection?()
第6题:
A Router with a BRI/T interface will be used for an ISDN Connection what other ISDN device is required to complete this connection? ()
第7题:
A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
第8题:
TestKing.com is configuring the serial interface of a Cisco router to connect to the router of a new ISP. A full T1 is being used for the Internet connection. After issuing the show interface serial 0/0 command, it is observed that the interface is UP and the line protocol is DOWN. Which of the following commands could fix this problem?()
第9题:
Twenty-Five
Forty
Sixteen
Seven
第10题:
TE1
TE2
TA
NT1
NT2
第11题:
Nothing. The router is already suitable.
A BRI WAN interface in the router.
An external NT1 to terminate the local loop.
A TA/NT1 device on the router.
第12题:
show interfaces serial 0/0
show running-config
show version
show controllers serial 0/0
show ip interface
show line serial 0/0
第13题:
A. Nothing. The router is already suitable.
B. A BRI WAN interface in the router.
C. An external NT1 to terminate the local loop.
D. A TA/NT1 device on the router.
第14题:
The network administrator must complete the connection between the RTA of the XYZ Company and the service provider. To accomplish this task, which two devices could be installed at the customer site to provide a connection through the local loop to the central office of the provider (Choose two.)()。
A.WAN switch
B.PVC
C.ATM switch
D.multiplexer
E.CSU/DSU
F.modem
第15题:
A. Router John uses a link-state routing protocol.
B. Router John will receive routing updates on the Serial0/0 interface.
C. Router John will receive routing updates on the Serial0/1 interface.
D. Router John will send routing updates out the Serial0/0 interface.
E. Router John will send routing updates out the FastEthernet0/0 interface.
F. Router John will send routing updates out the Serial0/1 interface.
第16题:
The network administrator must complete the connection between the RTA of the XYZ Company and the service provider. To accomplish this task, which two devices could be installed at the customer site to provide a connection through the local loop to the central office of the provider (Choose two.)()。
第17题:
A router with a serial interface will be used for an ISDN link.What other function group devices are required to complete the connection to the service provider? ()
第18题:
Which device enables a router serial interface to connect to the ISDN BRI?()
第19题:
Which two statements are true about the role of split horizon?()
第20题:
At a branch location, TestKing.com has deployed a non modular router that is equipped with two serial interfaces and two Ethernet interfaces.What additional equipment must be used to allow the branch office to connect to the central office by using an ISDN service?()
第21题:
NT2
NT1
TE
TA
TE1
第22题:
TE1
TE2
NT1
NT2
第23题:
WAN switch
PVC
ATM switch
multiplexer
CSU/DSU
modem