A. data center
B. teleworker
C. branch
D. campus
第1题:
What are two characteristics of the relationship between the Cisco PIN architecture and CiscoValidated Designs? ()(Choose two.)
第2题:
Which two statements are characteristics of pin groups?()
第3题:
Which four statements about Ethernet virtual circuit (EVC) infrastructure are true? ()
第4题:
Which three of these Metro Ethernet services map to E-Line services that are defined by the MEF? ()
第5题:
Which three things are the building blocks of the Cisco VPLS architecture?()
第6题:
Which of the following is the correct connector for an internal floppy drive?()
第7题:
Which of the following is required to connect a partitioned p5-550 to a modem?()
第8题:
A modem adapter
An async adapter and serial cable
An Ethernet adapter
A 9-pin to 25-pin converter and serial cable
第9题:
Cisco validated Designs can be implemented quickly without customer input.
Cisco is focusing on the PIN architecture as a means to driving integrated networks.
The Cisco PIN architecture is a critical mechanism for supporting integrated markets because it can be implemented quickly.
The Cisco validated Designs program provides critical mechanisms for supporting integrated markets because the mechanisms can be implemented quickly.
第10题:
port tunneling on the Ethernet subinterface
VLAN tunneling on the Ethernet trunk
port tunneling on the Ethernet interface
VLAN tunneling on the Ethernet VLAN subinterface
port tunneling on the Ethernet trunk
第11题:
80 Pin SCSI Connector
68 Pin SCSI Connector, High Density
50 Pin SCSI Connector, High Density
50 Pin SCSI Connector, Low Density
第12题:
Cisco is focusing on Cisco Validated Designs as a means to driving integrated networks.
Cisco is focusing on the PIN architecture as a means to driving integrated networks.
The Cisco PIN architecture is a critical mechanism for supporting integrated markets because it can be implemented quickly.
The Cisco Validated Designs program provides critical mechanisms for supporting integrated markets because the mechanisms can be implemented quickly.
Cisco Validated Designs can be implemented quickly without customer input.
第13题:
Which two of these Metro Internet services map to E-LAN services that are defined by the MEF?()
第14题:
Click on the Exhibit button. Which of the following connectors is image D?()
第15题:
Which two of these are characteristics of Metro Ethernet? ()
第16题:
n the case of Ethernet transport, which two types of attachment circuits does L2TPv3 support? ()
第17题:
You work as a network administrator in your company. Communication inside the company is ensured by network environments, such as GET VPN, Dynamic Multipoint VPN and Ethernet. Which PIN architecture is applicable in those environments?()
第18题:
A technician is installing a printer that uses a parallel cable to connect to a computer. Which of the following pin configurations might the technician encounter? ()
第19题:
50-pin SCSI
40-pin ribbon
34-pin ribbon
4-pin SATA
第20题:
data center
teleworker
branch
campus
第21题:
Utilization of spoke-to-spoke dynamic tunnels
Utilization of multipoint GRE tunnels at the hub site
Utilization of hub-to-spoke dynamic tunnels
Support for multicast
第22题:
EVC infrastructure is a Layer 3 platform-independent routing architecture that supports IP overEthernet services
Ethernet flow point (EFP) is configured on the main interface
Feature commands like MQC-based QoS policies can be specified
EVC infrastructure is a Layer 2 platform-independent bridging architecture that supports Ethernetservices
Each Ethernet flow point (EFP) matches a predefined VLAN tag-based criteria
Ethernet flow point (EFP) is configured on the VLAN interface
第23题:
9 pin D-type
36 pin Centronics
25 pin Centronics
13 pin D-type
25 pin D-type