The construction of the bridge () due to the snowstorm.A.suspendB.suspendingC.has been suspendedD.suspended

题目
The construction of the bridge () due to the snowstorm.

A.suspend

B.suspending

C.has been suspended

D.suspended


相似考题

4.2 Your audit client, Prescott Co, is a national hotel group with substantial cash resources. Its accounting functions arewell managed and the group accounting policies are rigorously applied. The company’s financial year end is31 December.Prescott has been seeking to acquire a construction company for some time in order to bring in-house the buildingand refurbishment of hotels and related leisure facilities (e.g. swimming pools, squash courts and restaurants).Prescott’s management has recently identified Robson Construction Co as a potential target and has urgently requestedthat you undertake a limited due diligence review lasting two days next week.Further to their preliminary talks with Robson’s management, Prescott has provided you with the following brief onRobson Construction Co:The chief executive, managing director and finance director are all family members and major shareholders. Thecompany name has an established reputation for quality constructions.Due to a recession in the building trade the company has been operating at its overdraft limit for the last 18months and has been close to breaching debt covenants on several occasions.Robson’s accounting policies are generally less prudent than those of Prescott (e.g. assets are depreciated overlonger estimated useful lives).Contract revenue is recognised on the percentage of completion method, measured by reference to costs incurredto date. Provisions are made for loss-making contracts.The company’s management team includes a qualified and experienced quantity surveyor. His mainresponsibilities include:(1) supervising quarterly physical counts at major construction sites;(2) comparing costs to date against quarterly rolling budgets; and(3) determining profits and losses by contract at each financial year end.Although much of the labour is provided under subcontracts all construction work is supervised by full-time sitemanagers.In August 2005, Robson received a claim that a site on which it built a housing development in 2002 was notproperly drained and is now subsiding. Residents are demanding rectification and claiming damages. Robsonhas referred the matter to its lawyers and denied all liability, as the site preparation was subcontracted to SarwarServices Co. No provisions have been made in respect of the claims, nor has any disclosure been made.The auditor’s report on Robson’s financial statements for the year to 30 June 2005 was signed, withoutmodification, in March 2006.Required:(a) Identify and explain the specific matters to be clarified in the terms of engagement for this due diligencereview of Robson Construction Co. (6 marks)

更多“The construction of the bridge () due to the snowstorm. A.suspendB.suspendingC.has been suspendedD.suspended”相关问题
  • 第1题:

    His success was due to()he had been working hard

    A、that the fact

    B、that the fact

    C、which the fact of


    正确答案:B
    解析:同位语从句

  • 第2题:

    The road is _______ to traffic due to construction.

    A: closed

    B: close

    C: closing

    D: closely


    参考答案:A

  • 第3题:

    Refer to the exhibit. Why has this switch not been elected the root bridge for VLAN1?()

    A.It has more than one interface that is connected to the root network segment.

    B.It is running RSTP while the elected root bridge is running 802.1d spanning tree.

    C.It has a higher MAC address than the elected root bridge.

    D.It has a higher bridge ID than the elected root bridge.


    参考答案:D

  • 第4题:

    The bridge had been wrecked by the explosion.

    A:shaken
    B:fallen
    C:damaged
    D:trembled

    答案:C
    解析:
    本句意思:那座桥被炸毁了。wreck意思是“破坏,毁坏”,与damage(损坏,毁坏)意思相近。shake动摇,颤抖;fall来临,成为,落下;tremble颤抖,哆嗦。

  • 第5题:

    Construction on a new wing at the Markunas Museum ____as soon as additional funding has been arranged.

    A.has been resumed
    B.to be resuming
    C.was resumed
    D.will resume

    答案:D
    解析:
    四个选项是动词resume的几种时态和语态。A选项为现在完成时的被动语态;B选项为动词不定式,不能单独做谓语;C选项为过去式的被动语态;D选项为一般将来时。题目意为“建造马昆那博物馆的新翼在额外的资金被安排后___。”as soon as引导的状语从句中的时态是现在完成时,主句的时态不能发生在它之前,且resume一般不用于被动语态,因此选D。
      

  • 第6题:

    The construction of the new bridge has been()for two weeks because of the bad weather.

    • A、devoted
    • B、developed
    • C、depended
    • D、delayed

    正确答案:D

  • 第7题:

    单选题
    Some industries, such as construction and mining, have been _____.
    A

    male-dominating

    B

    male-domination

    C

    male-dominated

    D

    male-dominant


    正确答案: A
    解析:
    句意:有些行业一直是男性主导,如建筑和采矿。现在分词表示“动宾关系”。过去分词表示“主谓关系”。本句主语为“some industries”与“male”之间为被动关系,所以此处应该用过去分词形式。male-dominated“为男性所统治的”。

  • 第8题:

    单选题
    If your bridge-to-bridge radiotelephone ceases to operate,you must().
    A

    immediately anchor your vessel and arrange for repairs to the system

    B

    moor your vessel at the nearest dock available and arrange for repairs to the system

    C

    arrange for the repair of the system to be completed within 48 hours

    D

    exercise due diligence to restore the system at the earliest practicable time


    正确答案: B
    解析: 暂无解析

  • 第9题:

    问答题
    Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.

    正确答案:
    解析:

  • 第10题:

    单选题
    From here people can see the bridge____construction.
    A

    below

    B

    by

    C

    under

    D

    on


    正确答案: A
    解析:

  • 第11题:

    单选题
    A vessel cannot comply with all of the SOLAS requirements due to its construction. Where will this be indicated?()
    A

    Nowhere; the vessel must comply to engage in international trade

    B

    On the reverse of the SOLAS certificate

    C

    On the Exemption Certificate

    D

    On the Certificate of Inspection


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    In ship construction,frame spacing is().
    A

    greater at the bow and stern

    B

    reduced at the bow and stern

    C

    uniform over the length of the vessel

    D

    uniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses


    正确答案: D
    解析: 暂无解析

  • 第13题:

    The bridge which ______ last year looks really beautiful.

    A was built

    B built

    C was set up

    D had been built


    参考答案:A

  • 第14题:

    The bridge is ________ construction.

    A、in

    B、with

    C、under

    D、during


    参考答案:C

  • 第15题:

    A vessel cannot comply with all of the SOLAS requirements due to its construction. Where will this be indicated?

    A.Nowhere; the vessel must comply to engage in international trade

    B.On the reverse of the SOLAS certificate

    C.On the Exemption Certificate

    D.On the Certificate of Inspection


    正确答案:C

  • 第16题:

    Brunel worked only on shipping, bridge-building and railway construction.

    A.Right
    B.Wrong
    C.Not mentioned

    答案:B
    解析:

  • 第17题:

    The construction of the railway is said to have been terminated.

    A:resumed
    B:put an end to
    C:suspended
    D:re-scheduled

    答案:B
    解析:
    本句意思:据说这条铁路的建设已经结束。terminate意为“终止,结束”,与put an end to(结束)意思相近。resume继续,重新开始;suspend延缓,推迟;re-schedule重订计划。

  • 第18题:

    So far the construction of the two new bridges over the river ().

    • A、have  been  completed
    • B、has  been  completed
    • C、has  completed
    • D、have  completed

    正确答案:B

  • 第19题:

    单选题
    A vessel brought alongside should be fended off the towing vessel by().
    A

    crew members using their arms

    B

    crew members using the strong muscles of their legs

    C

    fenders

    D

    No fending is necessary due to the rugged construction of most towing vessels


    正确答案: D
    解析: 暂无解析

  • 第20题:

    名词解释题
    容许建筑高度(rong xu jian zhu gao du)allowable construction height of bridge

    正确答案: 公路(或铁路)定线中所确定的桥面(或轨顶)的标高,对桥下通航或排洪所必需的净空高度之差,就是容许建筑高度。应注意,桥梁的建筑高度不得大于它的容许建筑高度否则将不能保证桥下通航和排洪要求。
    解析: 暂无解析

  • 第21题:

    单选题
    While we were in London that year, the London Bridge ______ .
    A

    is being repaired

    B

    was being repaired

    C

    has been repaired

    D

    had been repaired


    正确答案: B
    解析:
    句意:那年我们在伦敦时,伦敦桥正在被修整。本句时间状语为过去的某个具体时间点,所以用过去进行时。

  • 第22题:

    名词解释题
    桥梁建筑高度(qiao liang jian zhu gao du)construction height of bridge

    正确答案: 桥面(或轨顶)对桥跨结构最低边缘的高差,即桥梁建筑高度。
    解析: 暂无解析

  • 第23题:

    单选题
    The travelers were _____ to find that the bridge had been washed away.
    A

    dismayed

    B

    prejudiced

    C

    prompted

    D

    questioned


    正确答案: B
    解析:
    dismay使惊慌。prejudice使……产生偏见。prompt促使。question询问,审问。