A.higher than the bus equency
B.lower than the bus equency
C.the same as the bus frequency but out of phase with it
D.same as the bus frequency and the circuit breaker may be closed at
第1题:
A.RECOVERY_PARALLELISM
B.FAST_START_MTTR_TARGET
C.LOG_CHECKPOINT_INTERVAL
D.FAST_START_PARALLEL_ROLLBACK
第2题:
You are attempting to parallel two AC generators, and the synchroscope(同步器) pointer is revolving in the fast direction. This indicates that the frequency of the incoming machine is ______.
A.higher than the bus frequency
B.lower than the bus frequency
C.the same as the bus frequency but out of phase with it
D.the same as the bus frequency and the circuit breaker may be closed at any pointer position
第3题:
第4题:
Which option must you choose to configure Node Manager on a machine (server or zone)?()
第5题:
You are attempting to increase the checkpoint interval on your database. Each of the following choices will affect the duration and/or frequency of checkpoints, except one. Which is it?()
第6题:
You upgrade your Oracle database in a multiprocessor environment. As a recommended you execute thefollowing script:SQL > @utlrp.sqlWhich two actions does the script perform?()
第7题:
slow direction, just before the 12 o'clock position
fast direction, just after the 12 o'clock position
fast direction, just before the 12 o'clock position
slow direction, just after the 12 o'clock position
第8题:
Closer to the coast
Farther from the coast
On the track line ahead of the fix
On the track line behind the fix
第9题:
higher than the bus frequency
lower than the bus freouencv
the same as the bus frequency but out of phase with it
the same as the bus frequency, and the circuit breaker may be closed at any pointer position
第10题:
higher than the bus frequency
lower than the bus frequency
the same as the bus frequency but out of phase with it
the same as the bus frequency and the circuit breaker may be closed at any pointer position
第11题:
slightly less than the line frequency
the same as the line frequency
slightly greater than the line frequency
All of the above
第12题:
Excessive fuel
Higher than normal temperatures for star up
Longer starting periods
Higher than normal lube oil pressure
第13题:
A. Convergence time is fractionally slower than STP.
B. Broadcast and fault domains are increased.
C. IP address space is difficult to manage.
D. Fast uplink convergence is supported for failover and fallback.
第14题:
A hurricane moving northeast out of the Gulf passes west of your position. You could expect all of the following EXPECT ______.
A.higher than normal swells
B.high winds
C.winds veering from south, through west, to northwest
D.light showers
第15题:
You are about to design a very fast convergence time on a service provider network. Which feature wouldyou utilize to declare a link failure within less than two seconds of the fault on a link?()
第16题:
You need to recover five data files that are spread across multiple disks. Which initialization parameter should you set to speed up redo application?()
第17题:
In your production database, you have multiple resource plan directives that refer to the consumer group DB_GRP. Which two statements are correct?()
第18题:
You use Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 to manage your Hyper-V environment. You start a physical-to-virtual (P2V) conversion by using the Convert Physical Server (P2V) Wizard. The wizard indicates that a driver is missing. You need to ensure that you can complete the P2V conversion. Which two actions should you perform?()
第19题:
fast convergence SFP
MTU discovery
redundancy links
keepalive
carrier delay
第20题:
The breaker should be closed when one synchronizing lamp is dark and the other is bright
The breaker should be closed when both synchronizing lamps are bright
The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
A portable phase sequence indicator must be used to verify the information from the lamps
第21题:
as fast, if not faster than, anyone else
as fast as, if not more fast than, anyone
as fast as, if not faster than, anyone else
as fast, if not faster than, anyone
第22题:
two frequencies must be brought into phase
the incoming machine accepts a small amount of load
the running machine must be unload
both voltages are equal
第23题:
slightly less than the oncoming generator frequency
the same as the bus frequency
slightly greater than the bus frequency
the same as the bus voltage