The survey ______ that the ship complied with the requirements of the regulations annexed to the said Convention.
A.Showed
B.Expressed
C.Described
D.Stated
第1题:
Regulations require certain records to be retained on board for at least 3 months after a ship is involved in a casualty or until advised that they are no longer needed on board by the ______.
A.owner
B.Master
C.person in charge
D.Officer in Charge,Marine Inspection
第2题:
The port State control officer may ensure that ______ are exhibited in conspicuous places throughout the ship.
A.survey planning document
B.muster lists
C.bulk carrier booklet
D.bulk carrier loading triangle
第3题:
材料:
A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.
An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.
(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;
(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.
问题:
The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.
A.longer than five years
B.shorter than five years
C.longer than 12 months
D.shorter than 12 months
When the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of expiry of the existing certificate to a date not exceeding five years from the date
It can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry date
B.3 months before its expiry date
C.2 months before its expiry date
D.after its expiry date
When the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of completion of the renewal survey to a date not exceeding five years from that date
请帮忙给出每个问题的正确答案和分析,谢谢!
第4题:
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
第5题:
to conform to
to draw up
to comply with
to be applicable to
第6题:
identifying and assessing customer business requirements
documenting and categorizing customer business requirements in terms of performance, availability, capacity and security
producing a documented technology strategy
creating a bill of materials
presenting documented business requirements to a customer and having the customer validate them
completing a site survey
第7题:
IMDG
Hague
SOLAS
MARPOL
第8题:
periodic survey
statutory survey
additional survey
annual survey
第9题:
in the ends of each tank
in the expansion trunk of each tank
above the weather deck
there are no requirements in the regulation
第10题:
A
B
C
D
第11题:
on the station bill
on a sign next to the liferaft
on the Certificate of Inspection
in the Operations Manual
第12题:
to check and inspect foreign ships
to verify the condition of a ship in compliance with requirements of international conventions
to fine ships
to detain ships
第13题:
Application for a waiver of any requirements of the regulations for oil transfer operations must be submitted to the ______.
A.District Commander
B.Commandant
C.Captain of the Port
D.nearest MSA office
第14题:
According to the regulations,normally,manholes in LFG tanks are located ______.
A.In the ends of each tank
B.In the expansion trunk of each tank
C.Above the weather deck
D.There are no requirements in the regulation
第15题:
()refers to the repair the ship every year.
第16题:
owner
Master
person in charge
Officer in Charge,Marine Inspection
第17题:
looking
seeing
sightseeing
inspection
第18题:
out of accordance with
in relation to
in conformity with
in connection with
第19题:
District Commander
Commandant
Captain of the Port
nearest MSA office
第20题:
District Commander
Commandant
Captain of the Port
nearest Coast Guard office
第21题:
put on board
installed
fitted
equipped
第22题:
lights that must be displayed on anchor buoys
the display of load line markings
minimum horsepower for tugs involved in rig moves
lighting of mobile offshore drilling units being towed
第23题:
satisfactory
satisfactorily
smooth
smoothly