When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.
A.Provide the proper trim
B.Prevent negative stability from developing
C.Prevent excessive longitudinal stresses
D.Control list
第1题:
That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.
A.separate laytime for loading and discharging
B.total laytime for loading and discharging
C.commencement of laytime
D.laytime commencement of loading and discharging
第2题:
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.
A.Alternate hold loading condition
B.Block hold loading condition
C.Part hold loading condition
D.Homogeneous hold loading condition
第3题:
Bonding cables are used during cargo transfer to ______.
A.provide safe electrical power connection to barge equipment
B.keep the vessel from surging excessively
C.prevent an accidental discharge of static electricity
D.secure the cargo hose to a hatch when loading overall
第4题:
a subsequent temperature rise will cause the cargo to overflow
air pockets may cause the cargo to bubble out of the ullage hole
the increased viscosity of the product requires higher loading pressure which increases the chances of a spill
the tank valve may be stiff and a spill will occur before the valve can be closed
第5题:
remove an existing list that would slow down cargo operations
initiate loading in conjunction with unloading at the hatch
improve stability during cargo operations
allow longshoremen easy access to the hatch
第6题:
only when the cargo is within its rail
after the cargo is checked by tallymen
as soon as the cargo loading or unloading begins
during the time when loading or unloading is going on
第7题:
only when the cargo is within its rail
during the time when loading or ynloading is going on
after the cargo is checked by tallymen
as soon as loading or discharging begins
第8题:
After loading and discharging, hatch covers will be opened.
After loading and discharging, hatch covers will be closed.
Before loading and discharging, hatch covers will be opened.
Before loading and discharging, hatch covers will be closed.
第9题:
the supercargo's
the shipper's
the shipowner's
carrier's
第10题:
about
in
with
from
第11题:
provide safe electrical power connection to barge equipment
keep the vessel from surging excessively
prevent an accidental discharge of static electricity
secure the cargo hose to a hatch when loading overall
第12题:
provide the proper trim
prevent negative stability from developing
prevent excessive longitudinal stresses
control list
第13题:
When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.
A.Available dunnage,and chocking
B.Crushability,and inherent vice
C.Sweat,and weight
D.Weight,and refrigeration
第14题:
______ is not one of the more commonly adopted solid bulk cargo distributions.
A.Alternate hold loading condition
B.Block hold loading condition
C.Part hold loading condition
D.Inhomogeneous hold loading condition
第15题:
after its arrival at the destination
during the ship's voyage at sea
before they come to the dock
during the time when the loading or diacharging is going on
第16题:
is not
has not
do not
does not
第17题:
are forbidden
are allowed
can be used
are usually used
第18题:
available dunnage,and chocking
crushability,and inherent vice
sweat,and weight
weight,and refrigeration
第19题:
arranging cargo
shipping cargo
cargo handling
weighing cargo
第20题:
The largest hatch of a ship
The hatch that is double rigged
The hatch where a disproportionate amount of cargo is atowed
The hatch where the most cargo is stowed
第21题:
lashing
shifting
lifting
tallying
第22题:
the Matitime Code of China
Certificate of Inspection
Oil Transfer Procedures Manual
IOPP Certificate
第23题:
We are loading flammable cargo.
We are loading dangerous cargo.
We are discharging flammable cargo.
We are discharging dangerous cargo.