Before passing the Suez Canal the master has to fill out ______ given by the pilot.
A.the Pilotage list
B.the Pilotage form
C.the Pilotage chart
D.the Pilotage certificate
第1题:
Before petroleum______, another way has to be found.
A、takes out
B、runs out
C、makes out
D、works out
第2题:
I undertake to bring to the notice of the Suez Canal Authorities,before my vessel ______ the Canal,any defects which may appear.
A.enters into
B.enters
C.enters in
D.enters to
第3题:
The master can refuse to ______ in the bill of lading the statements required by the Act if either he has reasonable grounds for suspecting that the information given by the shipper is inaccurate,or he has no reasonable means of checking it.
A.inoculate
B.innovate
C.inordinate
D.incorporate
第4题:
El Abbasa (Sweet Water) Canal______from River Nile at Cairo to Suez Canal at Ismaili.
A.extend
B.extending
C.are extending
D.extends
第5题:
第6题:
the Pilotage list
the Pilotage form
the Pilotage chart
the Pilotage certificate
第7题:
Suez Canal searchlight, air compressor and air conditioning compressor
Air compressor, boiler blower and refrigeration plant
Boiler blower, Suez Canal searchlight and refrigeration plant
Suez canal searchlight, air compressor and boiler blower
第8题:
passed
passes
pass
past
第9题:
the master should be immediately informed
the master will be prohibited from contacting the Administration or other organization
he will carry out the inspection after the master be informed and be ready
he will carry out the inspection without informing the master
第10题:
convey
convoy
escort
conform
第11题:
Their yellow book
Their seaman's book
Their Pilotage form
Their bill of health
第12题:
the remind of the master
the refer of the master
the render of the master
the request of the master
第13题:
A、Please fill in this form.
B、Please fill this form.
C、Please fill on this form.
D、Please fill out this form.
第14题:
At ______ an occasional survey has been carried out.
A.the remind of the master
B.the refer of the master
C.the render of the master
D.the request of the master
第15题:
Even where the contract was not made between the master and the consignee,it has been held ______ the master maintain an action against consignee upon an implied promise to pay the freight,in considering of his letting the goods out of his hands before payment.
A.where
B.which
C.that
D.when
第16题:
In 1979 an extensive ______ program was in progress throughout Suez Canal.
A.A dredge and widen
B.dredged and widened
C.dredging and widening
D.being dredging and widening
第17题:
gross tonnage
Suez Canal tonnage's
net tonnage's
Panama Canal tonnage's
第18题:
bollards
ballasts
bands
benefits
第19题:
except
except that
beside
except for
第20题:
a dredge and widen
dredged and widened
dredging and widening
being dredging and widening
第21题:
第22题:
enters into
enters
enters in
enters to
第23题:
at the first stop after a long voyage egby anchoring if possible
at the first stop after arrival at harbor
at the first stop after low load running
at the first stop after passing river or canal passage