A report of casualty to a mobile offshore drilling unit must include ______.
A.the estimated cost of damage to the unit
B.an evaluation of who was at fault
C.the amount of ballast on board
D.the name of the owner or agent of the unit
第1题:
A Notice of Marine Casualty to a vessel must include ______.
A.the estimated cost of damage
B.the name of the owner or agent of the vessel
C.an evaluation of who was at fault
D.the amount of ballast on board
第2题:
In the case of an injury causing a person to be incapacitated,the Master or person in charge of a mobile offshore drilling unit must submit a report to the ______.
A.nearest Marine Safety or Marine Inspection Office
B.nearest hospital
C.Department of Energy
D.American Bureau of Shipping
第3题:
According to the regulations for mobile offshore drilling units,"industrial personnel" are considered to be all persons carried on the ship for the sole purpose of carrying out the industrial business of the unit,except for ______.
A.the operator's representative
B.the crew required by the Certificate of Inspection
C.the galley personnel
D.the designated person in charge
第4题:
Where will you find the requirements for the signals that must be sounded by a mobile offshore drilling unit that is being towed through an area of restricted visibility?
A.COLREGS
B.MMS Rules
C.SOLAS Convention
D.Coast Pilot
第5题:
the operator's representative
the crew required by the Certificate of Inspection
the galley personnel
the designated person in charge
第6题:
one hour
two hours
ten hours
four hours
第7题:
becomes responsible for the safe movement of the rig
relieves the Offshore Installation Manager at the moment the rig is free from the bottom
must be designated as the person in charge of the rig
is a specialist who is hired to provide advice and guidance on aspects of the move
第8题:
under tow
fixed to the seabed
underway
All of the above
第9题:
load line certificate
Operations Manual
Safety of Life at Sea Certificate
Certificate of Inspection
第10题:
tour reports
hull reports
machinery repair record book
deck equipment log
第11题:
a request for assistance
the location of the unit at the time of the casualty
an estimate of the cost to repair damages
the amount of fuel remaining
第12题:
Record of drafts
Hull reports
Anchor record
Machinery repair book
第13题:
When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he ______.
A.becomes responsible for the safe movement of the rig
B.relieves the Offshore Installation Manager at the moment the rig is free from the bottom
C.must be designated as the person in charge of the rig
D.is a specialist who is hired to provide advice and guidance on aspects of the move
第14题:
An offshore drilling unit must be equipped with a first aid kit approved by the ______.
A.Coast Guard
B.American Bureau of Shipping
C.Minerals Management Service
D.Mine Safety and Health Administration
第15题:
To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.
A.load line certificate
B.Operations Manual
C.Safety of Life at Sea Certificate
D.Certificate of Inspection
第16题:
When the towing vessel enters the fog
When the drilling rig enters the fog
When the towing vessel can no longer be seen from the rig
Immediately
第17题:
Commandant of the Coast Guard
Owner of the unit
Nearest Coast Guard Marine Safety Office
Captain of the nearest port
第18题:
at anchor
being towed
aground
drilling
第19题:
is drilling on the Outer Continental Shelf
moves to a new drilling location in U-Swaters
engages in a voyage to a port of another country which is a party of MARPOL
All of the above
第20题:
nearest Marine Safety or Marine Inspection Office
nearest hospital
Department of Energy
American Bureau of Shipping
第21题:
the estimated cost of damage to the unit
an evaluation of who was at fault
the amount of ballast on board
the name of the owner or agent of the unit
第22题:
Coast Guard
American Bureau of Shipping
Minerals Management Service
Mine Safety and Health Administration
第23题:
lights that must be displayed on anchor buoys
the display of load line markings
minimum horsepower for tugs involved in rig moves
lighting of mobile offshore drilling units being towed