Deviation changes with a change in ______.A.latitudeB.headingC.longitudeD.sea conditions

题目

Deviation changes with a change in ______.

A.latitude

B.heading

C.longitude

D.sea conditions


相似考题
更多“Deviation changes with a change in ______.A.latitudeB.headingC.longitudeD.sea conditions ”相关问题
  • 第1题:

    ● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

    (75)

    A. proceedings

    B. controls

    C. forecasting’s

    D. prelibations


    正确答案:B

  • 第2题:

    When making changes to a server, which of the following is the BEST way to troubleshoot a problem?()

    A. Perform root cause analysis and then test the theory to determine the cause.

    B. Make changes to the system and document everything once the problem is resolved.

    C. Make multiple changes to all affected areas to resolve all potential issues.

    D. Make a change and if the problem is not resolved, reverse the change.


    参考答案:D

  • 第3题:

    During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.

    A.proceedings

    B.controls

    C.forecasting's

    D.prelibations


    正确答案:B
    解析:在一个项目的生命期内,有多种原因可以引起对需求的变更。当需要发生变更而工作正在进行时,可导致新的需求产生并迫使现有的需求发生变更。需要快速而有效地管理这些新的需求和新的变更。为了有效地分析这些变更的影响,必须确定每一个需求源,并记录变更的基本过程。无论如何,项目经理希望能追踪有关需求稳定性的、恰当的措施,以判断是否需要新的或修正的控制措施。

  • 第4题:

    All of followings should be done by the project manager during project control except ().

    A.Determine the a change has occurred
    B.Ensure that a change is agreed
    C.Make sure all changes are approveD.by management
    D.Manage changes as they occur

    答案:B
    解析:
    译文:项目经理不应该在项目控制过程中执行的工作是()。
    A)确定变更已经发生
    B)确保变更已达成共识
    C)确保所有变更都获得管理层批准
    D)在变更发生时,对变更进行管理

  • 第5题:

    ( )is not included in Perform Integrated Change Control Process.

    A.Defining subsidiary plans
    B.Approving changes
    C.Managing changes to deliverables
    D.Reviewing all change requests

    答案:A
    解析:
    执行变更控制过程中不包括定义附属计划。

  • 第6题:

    Changes may be requested by any stakeholder involved with the project,but changes can be authorized only by ( ) .

    A.executive IT manager
    B.project manger
    C.change control board
    D.project sponsor

    答案:C
    解析:
    项目变更可以由执行经理(executive IT manager)、项目管理者(project manager)、项目发起人(project sponsor)等任意项目干系人发起,但只能由变更控制委员会(change control board)授权通过。(73) A.执行经理 B.项目经理 C.变更控制委员会 D.项目发起人

  • 第7题:

    Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by()

    • A、executive IT manager
    • B、projectmanger
    • C、change control board
    • D、projectsponsor

    正确答案:C

  • 第8题:

    When making changes to a server, which of the following is the BEST way to troubleshoot a problem?()

    • A、 Perform root cause analysis and then test the theory to determine the cause.
    • B、 Make changes to the system and document everything once the problem is resolved.
    • C、 Make multiple changes to all affected areas to resolve all potential issues.
    • D、 Make a change and if the problem is not resolved, reverse the change.

    正确答案:D

  • 第9题:

    单选题
    When making changes to a server, which of the following is the BEST way to troubleshoot a problem?()
    A

     Perform root cause analysis and then test the theory to determine the cause.

    B

     Make changes to the system and document everything once the problem is resolved.

    C

     Make multiple changes to all affected areas to resolve all potential issues.

    D

     Make a change and if the problem is not resolved, reverse the change.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    When conditions change with time, we should revise our policies_____.
    A

    accordingly

    B

    consequently

    C

    presumably

    D

    preliminarily


    正确答案: D
    解析:
    accordingly因此;相应地。consequently因此,结果是。presumably推测起来,大概。preliminarily初级地,预备地。

  • 第11题:

    单选题
    The vertical component of the Earth’s magnetic field causes induced magnetism in vertical soft iron. This changes with latitude. What corrects for this coefficient of the deviation? ()
    A

    The Flinders bar

    B

    The heeling magnet

    C

    Quadrantal soft iron spheres

    D

    Bar magnets in the binnacle


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
    A

    proceedings

    B

    controls

    C

    forecastings

    D

    Prelibations


    正确答案: C
    解析: 该题的关键词为"appropriate measures、 requirements volatility",其语句结构为"The project manager(主{吾) may, however, want to track(谓{吾) appropriate measures of requirements volatility(宾语) to judge whether new or revised()are necessary(目的状语从句)",含义为"项目经理也许会跟踪需求变化的相关度量,以判断是否应该调整的或者新的什么",因为整段文字讨论的内容都集中于需求变更管理,所以只分析最后一句即可,根据题意,应该在空白处填写"措施"一类的词汇,排除之后只有选项B比较适合,选项A、C和D都可以排除,尤其是选项D是一个很生僻的词汇,含义为"尝试"。

  • 第13题:

    ● Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by (73).

    (73)

    A.executive IT manager

    B.project manger

    C.change control board

    D.project sponsor


    正确答案:C
    试题(73)分析
     项目变更可以由IT经理executive IT manager、项目管理者project manager、项目发起人project sponsor等任意项目干系人发起,但只有变更控制委员会change control board授权通过,所以选C。
    参考答案
    (73)C

  • 第14题:

    management includes negotiating the terms and conditions in contracts and ensuring compliance with the terms and conditions,as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution

    A.Contract

    B.Document

    C.Communication

    D.Risk


    正确答案:A
    本题目翻译:干系人管理包括协商的条款和条件的合同,并确保遵守的条款和条件,以及记录和商定其实施或执行过程中可能出现的任何改变或修正。考察的是干系人管理。

  • 第15题:

    材料:

    Intention can be inferred in many ways by the courts.Thus the discharge at Cadiz instead of Bombay“for nefarious reasons”was an unreasonable deviation.A transshipment was declared to be an unreasonable deviation “since no excuse has been proffered for the deviation.” A geographic deviation abrogated the contract because“there can be no suggestion that the deviation was other than voluntary.”

    On the other hand,where the court was unable to find that a defendant&39;s action constituted“a voluntary deviation without reasonable cause,” the defendant was exculpated of liability.The vast majority of decisions require that intention be proved in cases of deviation and quasi-deviation.The carrier has the burden of proving that it had no intention to deviate or that the deviation was not for the carrier&39;s sole benefit.

    Accordingly,a geographic deviation due to an erroneous change of course by the master is not a deviation,but an error in navigation;in such a case,the carrier is protected under the Rules.If,however,the master is ordered to alter the customary or planned route,or deliberately takes it upon himself to do so,for a reason other than to save persons or cargo(or some similar reason),then the course alteration is an unreasonable deviation,because it is intentional and for the carrier&39;s own benefit.

    nefarious,邪恶的,穷凶极恶的

    proffer,提出

    abrogate,使作废

    问题:

    If the carrier has proved that he had no intention to deviate or that the deviation was not for his sole benefit ________.

    A.he will be exculpated of liability

    B.he is to investigate the case further

    C.he will not be exculpated of liability

    D.he has to contact with the shipper to see if he himself is free of any liability

    A geographic deviation due to an erroneous change of course by the master ________.A.is not a reasonable deviation

    B.is not an error in navigation

    C.is a reasonable deviation

    D.can not be determined if it constitutes a reasonable deviation

    Where the court is unable to find that a defendant's action constituted “a voluntary deviation without reasonable cause,”________.A.the defendant will not be responsible for the loss and damage

    B.the defendant will be responsible for the loss and damage

    C.if the defendant be responsible for the loss and damage can not be determined

    D.the court should not make any decision

    An unreasonable deviation must be committed by the master ________.A.intentionally

    B.for the carrier's own benefit

    C.intentionally and for the carrier's own benefit

    D.reasonably

    请帮忙给出每个问题的正确答案和分析,谢谢!


    问题 1 答案解析:A


    问题 2 答案解析:C


    问题 3 答案解析:A


    问题 4 答案解析:C

  • 第16题:

    ( ) management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution.

    A.Contract
    B.Document
    C.Communication
    D.Risk

    答案:A
    解析:
    (合同)管理包括合同中的谈判条款和条件,并确保遵守条款和条件,以及记录和商定实施或执行过程中可能出现的任何变更或修正。

  • 第17题:

    Change management would typically be composed of the raising and recording of changes, assessing the impact, cost, benefit and risk of proposed changes,developing business justification and obtaining approval, managing and coordinating change implementation, monitoring and reporting on implementation, reviewing and closing ().


    A. change reason
    B. change model
    C. remediation plan
    D. change requests


    答案:D
    解析:

  • 第18题:

    Changes may be requested by any stakeholder involved with the project,but changes can be authorized only by ( ) .

    A.executive IT manager
    B.project manger
    C.change control board
    D.project sponsor

    答案:C
    解析:
    项目变更可以由执行经理(executive IT manager)、项目管理者(project manager)、项目发起人(project sponsor)等任意项目干系人发起,但只能由变更控制委员会(change control board)授权通过。A. 执行经理 B. 项目经理C. 变更控制委员会 D. 项目发起人

  • 第19题:

    Which statement correctly describes the change tracking writer (CTWR) background process?()

    • A、 It keeps track of changes in the background processes.
    • B、 It records the system change number (SCN) in the control file.
    • C、 It writes audit records for user changes to the change tracking file.
    • D、 It records any changes to the listened configuration in the listener.ora file.
    • E、 It records any changes to the database parameters in the change tracking file.
    • F、 It records the physical location of all the changes that are made to the database in the change tracking file.

    正确答案:F

  • 第20题:

    单选题
    Deviation changes with a change in().
    A

    latitude

    B

    heading

    C

    longitude

    D

    sea conditions


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    The compass deviation changes as the vessel changes().
    A

    geographical position

    B

    speed

    C

    heading

    D

    longitude


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Magnetic variation changes with a change in().
    A

    the vessel's heading

    B

    sea conditions

    C

    seasons

    D

    the vessel's position


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Inductance is the property of an electric circuit that ()
    A

    opposes any change in the applied voltage

    B

    opposes any change in the current flow through the circuit

    C

    aids any changes in the applied voltage

    D

    aids any changes in the current through the circuit


    正确答案: D