Refrigeration machinery is often surveyed before loading reefer cargo. This survey is usually performed by the ______.
A.MSA
B.CCS
C.CCIQ
D.local port authority
第1题:
The port State control officer may ensure that ______ are exhibited in conspicuous places throughout the ship.
A.survey planning document
B.muster lists
C.bulk carrier booklet
D.bulk carrier loading triangle
第2题:
If reefer spaces are not properly cleaned prior to loading cargo,it will most likely cause ______.
A.mold to develop on commodities
B.malfunction of the refrigeration equipment
C.contamination of the insulation in the space
D.All of the above
第3题:
第4题:
Get ready the mooring machinery, mooring lines and the gangway for ().
第5题:
“装货前用帆布盖好污水沟”可译成:COVER BILGES WITH TARPAULINS BEFORE LOADING。
第6题:
maintain adequate coil back pressure
prohibit flashing in the liquid line
reduce refrigerant volume in the system
reduce compressor discharge line loading
第7题:
kept
removed
replaced
recycled
第8题:
carry the cargo at a cooler temperature than originally planned
write up exception on the cargo
refuse to carry the cargo
discharge CO2 into the compartment after loading
第9题:
We often maintain deck machinery.
We often repair deck machinery.
We often clean and paint deck.
We often adjust deck machinery.
第10题:
PRC Customs Service
OSHA
CCS
CCIQ
第11题:
We are loading flammable cargo.
We are loading dangerous cargo.
We are discharging flammable cargo.
We are discharging dangerous cargo.
第12题:
ventilate all compartments,see that the machinery is clean and there are no obstructions
just turn the key and start up
take for granted that there are no fuel leaks
assume there are no volatile fumes in the engine space
第13题:
When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.
A.Available dunnage,and chocking
B.Crushability,and inherent vice
C.Sweat,and weight
D.Weight,and refrigeration
第14题:
The tricing pendants should be released ______.
A.Before the gripes are removed
B.Before loading the passengers
C.After loading the passengers
D.After the boat is afloat
第15题:
We are loading the flammable cargo.()
第16题:
装卸货之前,打开舱盖。()
第17题:
MSA
CCS
CCIQ
local port authority
第18题:
frosting of the liquid line
higher than normal head pressure
a clear sight glass
abnormally cold reefer boxes
第19题:
available dunnage,and chocking
crushability,and inherent vice
sweat,and weight
weight,and refrigeration
第20题:
flushed with clean refrigerant oil
purged with the refrigerant
washed with an ammonia and alcohol solution
grounded to compressor
第21题:
我们正在卸易燃货。
我们正在卸易爆货。
我们正在装易燃货。
我们正在装易爆货。
第22题:
mold to develop on commodities
malfunction of the refrigeration equipment
contamination of the insulation in the space
All of the above
第23题:
after control of fire,flooding,and structural repairs
immediately,before the emergency is under control
after control of fire,but before control of flooding
after stability is restored