Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.
A.18 months
B.2 years
C.3 years
D.5 years
第1题:
Which statement about the dangerous cargo manifest,carried on a ship,is TRUE ________.
A.The manifest must be made up by the Master or other designated ship's officer
B.Shipments of hazardous and non-hazardous cargo may be listed on the manifest if they are destined for the same consignee
C.The manifest must be kept in a designated holder on or near the bridge
D.The type of label(s)required for each cargo must be indicated
第2题:
A tug would NOT assist a ship to steer if the tug is made up to the large vessel ______.
A.by a tow line ahead of the vessel
B.forward on either bow of the vessel
C.approximately amidships of the vessel
D.on the vessel’s quarter
第3题:
longitudinally
vertically
transversely
intermittently
第4题:
18 months
2 years
3 years
5 years
第5题:
S
T
W
F
第6题:
INTERNATIONAL LOAD LINE CERTIFICATE
PASSENGER SHIP SAFETY CERTIFICATE
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
GENERAL DECLARATION
第7题:
mooring tension
riser tension
lifesaving equipment
structural strength
第8题:
minerals management service
Department of energy
corps of engineers
a recognized classification socitey approved
第9题:
Once a day
At the change of every watch
Only when in fresh or brackish water
Prior to getting underway
第10题:
The line over the summer load waterline
The line above the tropical load waterline
The line below the tropical load waterline
The line between the summer and the winter north Atlantic load waterline
第11题:
Certificate of Inspection
Load line certificate
Certificate of Documentation
SOLAS Certificate
第12题:
Once a day
At the change of every watch
Only when in fresh or brackish water
Prior to getting underway
第13题:
A load line of a ship is assigned by ______.
A.Minerals Management Service
B.Department of Energy
C.Corps of Engineers
D.A recognized classification society approved
第14题:
在集合地点集合。()
第15题:
the load line becomes submerged
a non-watertight opening is at still water level
offset becomes excessive
reserve buoyancy is a maximum
第16题:
the ship is made fast
the ship‟s first line is sent ashore
the ship is dredging anchor
the ship‟s pilot disembarks
第17题:
by a tow line ahead of the vessel
forward on either bow of the vessel
approximately amidships of the vessel
on the vessel's quarter
第18题:
S
T
W
F
第19题:
Ballast Control Operator
Barge Supervisor
Master or Offshore Installation Manager
operators representative
第20题:
when the line pull reaches the rated winch capacity
after the line pull exceeds the rated winch capacity
after a short build-up of torque
immediately
第21题:
2year
3years
4years
5years
第22题:
maximum pressure allowed at that branch
name of the space or spaces which it serves
date of the last maintenance inspection
pressure needed to maintain an effective stream at that point
第23题:
Unless
When
Because
Even though