A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a ______.A.yearly inspectionB.quarterly inspectionC.monthly inspectionD.weekly inspection

题目

A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a ______.

A.yearly inspection

B.quarterly inspection

C.monthly inspection

D.weekly inspection


相似考题
更多“A ship crane which has been idle for a period of over six months shall be inspected to the ”相关问题
  • 第1题:

    The Owners let,and the Charterers _______ the Vessel for a Period of six(6)calendar months(exact period at Charterers' option)commencing from the time of delivery of the Vessel.

    A.borrow

    B.use

    C.hire

    D.rent


    正确答案:C

  • 第2题:

    材料:

    A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.

    An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.

    (i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

    (1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;

    (2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;

    (ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

    (1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;

    (2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;

    (iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

    (1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;

    (2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.

    问题:

    The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.

    A.longer than five years

    B.shorter than five years

    C.longer than 12 months

    D.shorter than 12 months

    When the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate

    B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate

    C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date

    D.from the date of expiry of the existing certificate to a date not exceeding five years from the date

    It can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry date

    B.3 months before its expiry date

    C.2 months before its expiry date

    D.after its expiry date

    When the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate

    B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate

    C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date

    D.from the date of completion of the renewal survey to a date not exceeding five years from that date

    请帮忙给出每个问题的正确答案和分析,谢谢!


    问题 1 答案解析:B


    问题 2 答案解析:B


    问题 3 答案解析:D


    问题 4 答案解析:D

  • 第3题:

    The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.

    A1836-1848

    B1842-1848

    C1848-1908

    D1858-1918


    D

  • 第4题:

    The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

    • A、 There are discolored ceiling tiles near the middle of the room.
    • B、 Large amounts of dust have accumulated in the corners of the room.
    • C、 The anti-static carpet has been removed resulting in a bare painted concrete floor.
    • D、 A wet pipe water-based sprinkler system has been installed above the racks.

    正确答案:C

  • 第5题:

    Initially, for the Automatic Workload Repository (AWR) statistics,the retention period is set to 7 days, the collection interval is set to 30 minutes and the collection level is set to Typical in your production database. You have been using the Memory Advisor for the last three months to generate recommendations for tuning memory components. However,when you observe the Memory Advisor on a Friday,you find that the statistics are available only for two days, Thursday and Friday,of that week. What would have caused the statistics to be removed?()

    • A、On Wednesday, the statistics have been purged.
    • B、On Wednesday, the retention period has been set to zero.
    • C、On Wednesday, the collection interval has been set to zero.
    • D、On Wednesday, the collection level has been changed to All.
    • E、On Wednesday, the retention period has been set to one day.
    • F、On Wednesday, the retention period has been set to two days
    • G、On Wednesday, the collection level has been changed to Typical.
    • H、On Wednesday, the collection interval has been set to 1440 minutes.

    正确答案:F

  • 第6题:

    单选题
    An International Ship Security Certificate shall be issued for a period specified by the Administration which shall not exceed ()
    A

    six months

    B

    two years

    C

    four years

    D

    five years


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    The Garbage Record Book, as a part of the ship’s official logbook, shall be kept on board and preserved for a period of ()
    A

    3 years after making the first entry

    B

    2 years after the last entry

    C

    3 months after last entry

    D

    3 years after the last entry


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a().
    A

    yearly inspection

    B

    quarterly inspection

    C

    monthly inspection

    D

    weekly inspection


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Port of Registry refers to the port where().
    A

    the ship has been named

    B

    the ship has been built

    C

    the ship has been signed

    D

    the ship has been registered


    正确答案: A
    解析: 暂无解析

  • 第10题:

    判断题
    Violence over the next six months will increase despite the successful military operations that had been achieved so far, according to Bremer.
    A

    B


    正确答案:
    解析:
    根据录音可知Bremer认为虽然伊拉克度过了一个非常重要的时期,但在接下来六个月暴力活动将会增加,而这正是因为即将到来的成功。可见题干内容与之相符。
    【录音原文】
    “It’s a question that really ought to be asked in six months, when we get through this very important crucial period and let’s see where we are,” he said. “My own guess is we’re going to have an increase in violence over the next six months.” “The violence will be precisely because of the fact that we’re building momentum toward success,” Bremer said.

  • 第11题:

    单选题
    On a ship,firefighting equipment must be inspected once every().
    A

    three months

    B

    six months

    C

    twelve months

    D

    eighteen months


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Good title to the Goods delivered to the ship shall not pass to the()until full payment for same has been made.
    A

    Vendor

    B

    Purchaser

    C

    Master

    D

    Shipper


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Until security has been provided the Contractor shall have a maritime lien on ______ for his remuneration.

    A.the property lost

    B.the property salved

    C.the property involved in the accident which gave rise to the salvage operations

    D.any other property in danger which is not and has not been on board the vessel


    正确答案:B

  • 第14题:

    ____ just six months ago, Finson’s Grill has quickly become one of the most popular restaurants in Detion.

    A.Opened
    B.Had been opening
    C.Been opened
    D.To open

    答案:A
    解析:
    四个选项是动词open的几种时态。A选项为一般过去时;B选项为过去完成时;C选项为被动语态,意为“被打开”;D选项为一般将来时。题目意为“六个月前刚刚___的芬森的烧烤店很快就成为Detion最受欢迎的餐厅之一。”时间状语是six months ago,为过去时,因此选A。
      

  • 第15题:

    The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.

    • A、1836-1848
    • B、1842-1848
    • C、1848-1908
    • D、1858-1918

    正确答案:D

  • 第16题:

    A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

    • A、Ensure Director Agent is installed on the new servers.
    • B、Ensure a DHCP Sever is installed and configured in the environment.
    • C、Ensure Server Plus Pack option has been installed and configured.
    • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
    • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

    正确答案:B,E

  • 第17题:

    单选题
    Purging air from a hydraulic system is necessary when()
    A

    adding small amounts of oil to the system

    B

    the system has been overheated

    C

    the system has been drained and then filled with new oil

    D

    the system has been idle for a long period of time


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    Before starting a reciprocating, steam-driven pump that has been idle for a period of time, you should ().
    A

    open the steam line mot valve

    B

    drain the steam cylinder

    C

    close the steam cylinder drains

    D

    open the liquid cylinder drains


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    View the Exhibit to examine the metrics with a threshold.Which statement is true regarding the Number of Transactions (per second) metric?()
    A

    Oracle uses statistical relevance to determine when an adaptive threshold has been breached for the metric.

    B

    The statistics for the metric values observed over the baseline time period are not examined to determine threshold values.

    C

    Oracle determines when an adaptive threshold has been breached based on the maximum value captured by the baseline.

    D

    The total concurrent number of threshold violations, which must occur before an alert is raised for the metric, has been set to zero.


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Loss or damage caused by cutting away wreck or parts of the ship which have been previously carried away or are effectively lost by accident shall not be made()as general average.
    A

    firm

    B

    sure

    C

    good

    D

    fair


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Initially, for the Automatic Workload Repository (AWR) statistics,the retention period is set to 7 days, the collection interval is set to 30 minutes and the collection level is set to Typical in your production database. You have been using the Memory Advisor for the last three months to generate recommendations for tuning memory components. However,when you observe the Memory Advisor on a Friday,you find that the statistics are available only for two days, Thursday and Friday,of that week. What would have caused the statistics to be removed?()
    A

    On Wednesday, the statistics have been purged.

    B

    On Wednesday, the retention period has been set to zero.

    C

    On Wednesday, the collection interval has been set to zero.

    D

    On Wednesday, the collection level has been changed to All.

    E

    On Wednesday, the retention period has been set to one day.

    F

    On Wednesday, the retention period has been set to two days

    G

    On Wednesday, the collection level has been changed to Typical.

    H

    On Wednesday, the collection interval has been set to 1440 minutes.


    正确答案: F
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following sentences is INCORRECT?
    A

    His father has been dead for six years.

    B

    His father died six years ago.

    C

    It’s six years since his father had died.

    D

    It has been two years since his father’s death.


    正确答案: B
    解析:
    考查动词的时态。C选项中的固定句型:“It’s/ It has been+一段时间+since+时间状语从句”,译作“自从……以来,已经……(时间)了”。要求:主句的谓语动词用一般现在时或现在完成时;从句的谓语动词用一般过去时,而且须是终止性动词。所以C选项中since后面的过去完成时应改为一般过去时。

  • 第23题:

    单选题
    The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.
    A

    1836-1848

    B

    1842-1848

    C

    1848-1908

    D

    1858-1918


    正确答案: B
    解析: 暂无解析