A semisubmersible rig under tow should be ballasted down if ______.
A.motion begins to be excessive
B.water begins to break over the pontoons
C.period of roll exceeds 12 seconds
D.forward progress is halted by head wind
第1题:
When a winch breaks down,or some similar occurrence makes only one winch available at a hatch,which alternate rig would provide a temporary solution while repairs are made ________.
A.Frisco Rig
B.Split fall rig
C.West Coast Rig
D.Yard and stay jury rig
第2题:
be on an even keel
be trimmed slightly by the head
have a drag of not more than 60 - 90 centimeters
be ballasted so the forefoot is near the surface
第3题:
notify the tug
deploy life bouys
launch a boat
sound the general alarm
第4题:
Increase the cooling water flow to the engine
Secure or reduce fuel to that cylinder
Screw down on the pressure adjusting spring to decrease to decrease popping pressure
Readjust the injection timing
第5题:
gangway
ladder
pilot ladder
gangway combined with pilot ladder
第6题:
zero inclination to full inclination on one side
full inclination on one side to full inclination on the other side
full inclination on one side to the next full inclination on the same side
zero inclination to the next zero inclination
第7题:
removed from the anchor chain
connected to a buoy at the anchor
stripped back to the rig and secured
connected to a buoy halfway down the chain
第8题:
eddies under the bar
swift current under the bar causing loss of control
cross-currents pushing the tow away from the bar
cross-currents pushing the tow into the bar
第9题:
actual total loss
constructive total loss
general average
particular average
第10题:
American Bureau of Shipping classification rules
International Regulations for Preventing Collisions at Sea
Safety of Life at Sea Convention
Minerals Management Service rules
第11题:
reduce the draft of the barge
shorten one leg of the bridle
place bulky deck loads as far aft as possible
trim the barge down by the bow
第12题:
motion begins to be excessive
water begins to break over the pontoons
period of roll exceeds 12 seconds
forward progress is halted by head wind
第13题:
Apparent wind speed blowing across a vessel under tow can be measured by a(n)______.
A.barometer
B.wind vane
C.anemometer
D.Thermometer
第14题:
When the towing vessel enters the fog
When the drilling rig enters the fog
When the towing vessel can no longer be seen from the rig
Immediately
第15题:
coming up from the BDC
coming up from the TDC
coming down from the BDC
coming down from the TDC
第16题:
the towing vessel should slip first
the vessel towed should slip first
they should slip simultaneously
either vessel may slip first
第17题:
steamer will drift stern downwind
tug will drift faster than the steamer
tug should approach stern to
tug should approach from downwind
第18题:
change course
slow down
heave to
adjust tow line length
第19题:
Chain
Ring
Solid thimble
A fishplate
第20题:
barometer
wind vane
anemometer
thermometer
第21题:
actual total loss
constructive total loss
general average
particular average
第22题:
To avoid immediate danger
When authorized by the rig superintendent
To comply with an operator's requirement
Under no conditions
第23题:
tow strain
catenary length
being in step
Williamson's Tow