参考答案和解析
参考答案:正确
更多“Inexhaustible resources are those that cannot be reproduced. Once the point of no retu ”相关问题
  • 第1题:

    若有语句int *point,a=4;和point=&a;下面均代表地址的一组选项是( )

    A.a,point,*&a
    B.&*a,&a,*point
    C.*&point,*point,&a
    D.&a,&*point,point

    答案:D
    解析:

  • 第2题:

    若有语句int *point, a=4; point=&a; 下面均代表地址的一组选项是

    A.point, *&a

    B.&*a, &a, *point

    C.*&point, *point, &a

    D.&a, &*point , point


    &a,&*point,point

  • 第3题:

    若有语句 int *point, a = 4; point = &a; 下面均代表地址的一组选项是()

    A.point,*&a

    B.&*a,&a, *point

    C.*&point, *point, &a

    D.&a, & *point,point


    &a, &*point , point

  • 第4题:

    ()are?those?costs?that?cannot?be?directly?traced?to?a specific?project?and?therefore?will?be?accumulated?and allocated?equitably?over?multiple?projects?by?some?approved and?documented?accounting?procedure.

    A.Direct costs
    B.Operation costs
    C.Indirect costs
    D.Implement costs

    答案:C
    解析:
    本题翻译:
    ()是指不能直接追溯到特定项目的成本,因此将通过一些批准和记录的会计程序在多个项目上平均累计和分配。
    A.直接成本B.运营成本C.间接成本D.实施成本
    本题考查成本的分类,不能直接的就可以理解为间接,间接成本:来自一般管理费用科目或几个项目共同负担的项目成本所分摊给本项目的费用。
    而成本管理中不是涉及运营成本、实施成本。排除BD选项。所以此题选择C选项。

  • 第5题:

    若有语句int *point,a=4;和 point=&a;下面均代表地址的一组选项是()

    A.point,*&a

    B.&*a,&a,*point

    C.*&point,*point,&a

    D.&a,&*point,point


    &a, &*point, point

  • 第6题:

    若有语句 int *point, a = 4; point = &a; 下面均代表地址的一组选项是()。

    A.point,*&a

    B.&*a,&a, *point

    C.*&point, *point, &a

    D.&a, & *point,point


    &a, &*point , point