第1题:
A cluster node has a failed fibre adapter requiring the node to be halted to replace it. To minimize downtime, what is the appropriate method of performing this repair?()
第2题:
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
第3题:
A customer is ready to order a pSeries solution. However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option. What is the most appropriate action for the specialist to take next?()
第4题:
Which command verifies both the cluster topology and resource configuration?()
第5题:
A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts That are run from corn. When a cluster verification is performed,which of the following will require a custom verification method?()
第6题:
HACMP ODM object classes
HACMP Error Notification
HACMP Topology & Resources
HACMP Application Server Start/Stop scripts
第7题:
SAN switches
Fibre channel Hub(s)
IBM Storage Manager Agents
IBM Subsystem Device Driver
第8题:
Use Failover Cluster Manager to perform a quick migration of all VMs to another cluster node
Use Failover Cluster Manager to pause the cluster node
Use VMM to place the cluster node in maintenance mode
Use VMM to pause all VMs and move them to another cluster node
第9题:
IBM Grid Toolbox
IBM Capacity on Demand
IBM Cluster Systems Management
IBM Global Solutions Directory
第10题:
Mysql NDB Cluster
Mysql Replication
Distributed Replicated Block Device (DRBD) and Mysql
Windows Cluster and Mysql
Solaris Cluster and Mysql
第11题:
CDAT
IBM Systems Director
Tivoli Provisioning Manager (TPM)
xREF
第12题:
z/OS
Linux
Sun Solaris 9
Microsoft Windows 2003
第13题:
In addition to AIX, which of the following operating systems is supported in a pSeries LPAR environment?()
第14题:
A customer wants to run a Cluster 1600 configuration with multiple p655 servers. They are using the new High Performance Switch for the high-speed interconnection between nodes. Which of the following is the only supported cluster management software?()
第15题:
A customer asks which bays they could install Multi-Switch Interconnect Module (MSIM). Which is the source of this information of the following?()
第16题:
Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()
第17题:
Your environment includes a Windows Server 2008 R2 Hyper-V failover cluster. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to perform maintenance on the Hyper-V failover cluster. You need to complete the maintenance on the failover cluster while maximizing the uptime of the virtual machines (VMs). What should you do prior to starting maintenance on each cluster node?()
第18题:
CDAT
IBM Systems Director
Tivoli Provisioning Manager (TPM)
BladeCenter Interoperability guide
第19题:
Ask the customer to confirm which option is best for their environment.
Order the fibre channel option and purchase a converter later if necessary.
Order both SCSI and fibre channel adapters to cover both potential options.
Inform the customer that fibre channel was selected for performance reasons.
第20题:
cldare -r
clsync -rt
clverify -r
clverify -t
第21题:
Perform the cIRGmove command to move the node’s resources to another cluster node.
Perform a graceful stop of the cluster,replace the adapter,and restart the cluster.
Perform a force stop of the cluster node,replace the adapter,and restart the cluster.
Perform a graceful takeover of the cluster,replace the adapter,and restart the cluster.
第22题:
CSM
PSSP
GPFS
HACMP
第23题:
port security
fabric binding
IVR
port tracking