LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0
LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0
LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0
LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0
第1题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第2题:
A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()
第3题:
Which of the following is a key advantage of AIX v5.3 over AIX v5.2?()
第4题:
Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()
第5题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第6题:
Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs to be moved to a p5 590 and assigned to a shared pool. Which of the following would best describe the profile requirements?()
第7题:
Would 10/100 Ethernets work as well?
Should there be eight fibre channel adapters?
Should there be an async adapter for heartbeat?
Will all LPARs need access to a common fibre channel tape drive?
第8题:
Maxperm% is set too low on LPAR 2
Insufficient paging space on LPAR 1
Service IBM.DRM is unavailable on LPAR 1
Insufficient pinnable memory frames available on LPAR 2
第9题:
Dynamic LPAR
Micro-Partitioning
Small Memory Real Mode
Capacity Upgrade on demand for memory
第10题:
The Power 550 is licensed for three LPARs only.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory to perform logical partition tasks.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.
第11题:
LPARs 1 and 2, capped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
LPARs 1 and 2, capped, SMT on, Weights between 100-130, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 25-30, min CPU 2.7, max CPU 3.0
LPARs 1 and 2, uncapped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
LPARs 1 and 2, uncapped, SMT off, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
第12题:
LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0
LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0
LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0
LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0
第13题:
A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenance while not incurring downtime. If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()
第14题:
Which of the following x366 8GB memory configurations will produce the best performance?()
第15题:
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
第16题:
An administrator wants to have the flexibility to dynamically move a fibre channel PCI card between given LPARs. For each given LPAR how should they add the PCI card to the LPAR profile?()
第17题:
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
第18题:
Add the fibre channel card as hared?Add the fibre channel card as ?hared?
Add the fibre channel card as irtual?Add the fibre channel card as ?irtual?
Add the fibre channel card as esired?Add the fibre channel card as ?esired?
Add the fibre channel card as equired?Add the fibre channel card as ?equired?
第19题:
LPAR-A with 1Gb FC HBA and SAN connection
LPAR-B with 2Gb FC HBA and SAN connection
LPAR-C with 4Gb FC HBA and SAN connection
LPAR-D with 8Gb FC HBA and SAN connection
第20题:
One memory card with four 2GB DIMMs
Two memory cards with four 2GB DIMMs
Two memory cards with eight 1GB DIMMs
Four memory cards with eight 1GB DIMMs
第21题:
Dual power supplies.
Twice the amount of disk.
Two dual-port LHEA adapters.
Two dual-port fibre channel adapters.
第22题:
Loadleveler
AIX Workload Manager
Partition Load Manager
Tivoli Provisioning Manager
第23题:
Remove the physical Ethernet adapters from the LPARs
Activate Advanced POWER Virtualization
Update microcode for the virtual adapters
Upgrade AIX V5.2 LPAR to AIX V5.3
第24题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs