Increase memory
Add more adapters
Increase both processors and adapters
Increase the number of processors by 20 - 30%
第1题:
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC. What is the probable cause?()
第2题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第3题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第4题:
Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()
第5题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第6题:
Increase memory
Add more adapters
Increase both processors and adapters
Increase the number of processors by 20 - 30%
第7题:
APV, AIX5.2ML4
AIX5.3 or i5/OS
APV, i5/OS, AIX5.3
APV, AIX5.3 or SuSE9
第8题:
Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required.
Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required.
Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262.
Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
第9题:
From the HMC
From a NFS mount
From a FTP server
From any CD or DVD drive on another server
第10题:
APV key is not registered
Networking and DNS are not configured
/etc/hosts table on HMC is not configured
Virtual IO Server dose not support DLPAR
第11题:
Upgrade the p690 to a p5 590 server running AIX 5.3
Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
第12题:
Create two virtual adapters on the client, each one from a separate Virtual IO Server
Enable dead gateway detection on the client so that the network traffic can be rerouted
Have a spare network card on standby in the client in case the Virtual IO Server goes down
Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two separate Virtual IO Servers
第13题:
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
第14题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第15题:
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
第16题:
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()
第17题:
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
第18题:
Reallocate the Virtual IO Server disks to the user LPAR
Create a stripe-group within the Virtual IO Server to protect against disk failure
Reconfigure the user LPAR to use both locally owned disk and a Virtual SCSI disk
Create a second Virtual IO Server and reconfigure the user LPAR to mirror across both Virtual IO Servers
第19题:
Assign the adapters to a Virtual IO partition
Use the MPIO function included in AIX 5.2
Migrate the application to AIX 5.3 and use the MPIO function
Set up two Virtual IO partitions and attach both partitions to the device
第20题:
Shared Ethernet Adapters and Virtual SCSI services require separate Virtual IO Servers.
Virtualized adapters require essentially the same Virtual IO Server resources regardless of adapter type.
Shared Ethernet Adapters require significantly more Virtual IO Server resources than Virtual SCSI services.
Virtual SCSI services require significantly more Virtual IO Server resources than Shared Ethernet Adapters.
第21题:
APV features are not supported for some legacy POWER4 adapters
APV will require the most current maintenance level for AIX 5.2
APV features will require that legacy POWER4 adapters be updated with new microcode
The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
第22题:
Assign the adapter to an IO Hosting partition
Use AIX 5L affinity to move the application from SUSE to AIX
Use AIX 5.3 drivers to install the adapter in the Linux LPAR
Assign the adapter to an AIX 5.3 partition running Linux Affinity
第23题:
128
254
320
640
第24题:
4 processors 8GB of memory
5 processors 8GB of memory
4 processors 10GB of memory
5 processors 10GB of memory