Create a VIO server
Modify the LPAR profiles to add a Virtual Ethernet adapter
Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
Buy the Advanced Power Virtualization feature and enter a authorization code at the service processor menu
第1题:
A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()
第2题:
A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()
第3题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第4题:
A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()
第5题:
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
第6题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第7题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第8题:
Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.
Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.
Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
第9题:
Deploy the application tier and the business tier to one role with two Medium instances.
Deploy the application tier and the business tier to one role with two Large instances.
Deploy the application tier role to a Medium instance. Deploy the business tier role to a medium instance.
Deploy the application tier role to a Large instance. Deploy the business tier role to a Large instance.
第10题:
The application server,firewall,and database server on the same VLAN
The application server and firewall on one VLAN,and the database server on a second VLAN
The application server on one VLAN,and the database server and firewall on a second VLAN
The application server and firewall on one VLAN,and the firewall and database server on a second VLAN
第11题:
The p5-570 would save rack space over a pair of p5-550 servers.
The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.
The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.
第12题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第13题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第14题:
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()
第15题:
Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition communication should be discussed with this customer?()
第16题:
A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each. When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch. Which of the following solutions would prevent them from having to buy another network switch or hub?()
第17题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第18题:
Create a VIO server
Modify the LPAR profiles to add a Virtual Ethernet adapter
Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
Buy the Advanced Power Virtualization feature and enter a authorization code at the service processor menu
第19题:
Shared Ethernet Adapters and Virtual SCSI services require separate Virtual IO Servers.
Virtualized adapters require essentially the same Virtual IO Server resources regardless of adapter type.
Shared Ethernet Adapters require significantly more Virtual IO Server resources than Virtual SCSI services.
Virtual SCSI services require significantly more Virtual IO Server resources than Shared Ethernet Adapters.
第20题:
VIO Server
AIX 5.2 ML4
Shared Ethernet Adapter
AIX 5.3 with Advanced Power Virtualization
第21题:
One single port Ethernet adapter
Four dual port Ethernet adapters
Two single port Ethernet adapters
Eight single port Ethernet adapters
第22题:
Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above.
Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux.
Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system.
Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.
第23题:
4 processors 8GB of memory
5 processors 8GB of memory
4 processors 10GB of memory
5 processors 10GB of memory