单选题Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()A Use alt_disk_installB Backup image to NIM serverC Backup using mksysb to DVD-RAMD Apply the upgrade and d

题目
单选题
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
A

Use alt_disk_install

B

Backup image to NIM server

C

Backup using mksysb to DVD-RAM

D

Apply the upgrade and do not commit


相似考题
更多“单选题Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()A Use alt_disk_installB Backup image to NIM serverC Backup using mksysb to DVD-RAMD Apply the upgrade and d”相关问题
  • 第1题:

    A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()

    • A、Use base media to restore system to AIX 5.1.
    • B、Use an alt_disk_install and boot back to the AIX 5.1 rootvg.
    • C、Make a mksysb of the original AIX to restore back to the AIX 5.1 level.
    • D、Perform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.

    正确答案:B

  • 第2题:

    Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

    • A、APV features are not supported for some legacy POWER4 adapters
    • B、APV will require the most current maintenance level for AIX 5.2
    • C、APV features will require that legacy POWER4 adapters be updated with new microcode
    • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

    正确答案:A

  • 第3题:

    Which is a supported method to upgrade firmware on an IBM Power Systems 570?()  

    • A、Use the /usr/sbin/invscout AIX command.
    • B、Use the ’Updates’ panel on the managing HMc
    • C、Boot the 570 using an IBM-provided microcode Cd
    • D、Use the /usr/lpp/diagnostics/bin/update_flash AIX command.

    正确答案:B

  • 第4题:

    Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()

    • A、Upgrade the p690 to a p5 590 server running AIX 5.3
    • B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
    • C、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
    • D、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization

    正确答案:D

  • 第5题:

    A system administrator needs to upgrade the Oracle database from Version 7 to Version 8.  Which of the following scheduling concerns should be considered?()

    • A、Schedule enough down time to backup, upgrade and reboot. 
    • B、Backup, upgrade, then schedule enough down time to reboot the system.
    • C、Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、There are no scheduling concerns because no down time is required.

    正确答案:A

  • 第6题:

    A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()

    • A、Upgrade system firmware to latest level
    • B、Upgrade to AIX 5.3
    • C、Upgrade HMC to version 6.1
    • D、Convert rootvg filesystems to JFS2

    正确答案:B

  • 第7题:

    A production system needs to be upgraded from AIX V5.1 to AIX V5.2. All logs and users need to be saved. Which installation method will accomplish the upgrade?()

    • A、Update Installation
    • B、Migration Installation
    • C、Preservation Installation
    • D、New and Complete Overwrite Installation

    正确答案:B

  • 第8题:

    单选题
    A production system needs to be upgraded from AIX V5.1 to AIX V5.2. All logs and users need to be saved. Which installation method will accomplish the upgrade?()
    A

    Update Installation

    B

    Migration Installation

    C

    Preservation Installation

    D

    New and Complete Overwrite Installation


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
    A

    Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. 

    B

    Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. 

    C

    Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. 

    D

    Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A p5 595 does not have any device connected to it for backup. What AIX method should be used to backup each of the LPAR environments and have a quick recovery path?()
    A

    Use savevg and copy to an NFS filesystem

    B

    Create a mksysb on an NFS exported filesystem

    C

    Use tar to copy system over network with a pipe

    D

    Create mksysb on an NFS exported NIM filesystem


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
    A

    APV features are not supported for some legacy POWER4 adapters

    B

    APV will require the most current maintenance level for AIX 5.2

    C

    APV features will require that legacy POWER4 adapters be updated with new microcode

    D

    The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()
    A

     Schedule enough down time to backup, upgrade and reboot. 

    B

     Backup, upgrade, then schedule enough down time to reboot the system. 

    C

     Backup, then schedule enough down time to upgrade and reboot the system. 

    D

     No scheduling processes are necessary because no down time is required.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()

    • A、 Schedule enough down time to backup, upgrade and reboot. 
    • B、 Backup, upgrade, then schedule enough down time to reboot the system. 
    • C、 Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、 No scheduling processes are necessary because no down time is required.

    正确答案:A

  • 第14题:

    Which installation method enables the quickest recovery in the event of failure when upgrading from AIX 5.3 to AIX 6.1?()

    • A、Use alt_disk_install.
    • B、Apply the upgrade without commit.
    • C、Use a backup image from a NIM server.
    • D、Use a mksysb image from a locally attached DVD-RAM.

    正确答案:A

  • 第15题:

    A production system needs to be upgraded from AIX V5.2 to AIX V5.3. All system logs and users need to be saved.  Which installation method will accomplish the upgrade()

    • A、Update Installation
    • B、Migration Installation
    • C、Preservation Installation
    • D、Mirror rootvg prior to a Preservation Installation

    正确答案:B

  • 第16题:

    Which is a supported method to upgrade firmware on an IBM Power Systems 570?()

    • A、Use the /usr/sbin/invscout AIX command
    • B、Use the 'Updates' panel on the managing HMC
    • C、Boot the 570 using an IBM-provided microcode CD
    • D、Use the /usr/lpp/diagnostics/bin/update_flash AIX command

    正确答案:B

  • 第17题:

    Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()

    • A、Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. 
    • B、Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. 
    • C、Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. 
    • D、Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.

    正确答案:C

  • 第18题:

    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()

    • A、Migration installation
    • B、Partition Mobility
    • C、alt_disk_install
    • D、update_all smit fastpath and reboot during the next scheduled outage

    正确答案:C

  • 第19题:

    单选题
    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()
    A

    Migration installation

    B

    Partition Mobility

    C

    alt_disk_install

    D

    update_all smit fastpath and reboot during the next scheduled outage


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()
    A

    IBM Techline

    B

    IBM Supportline

    C

    IBM Software Distribution

    D

    IBM Hardware Support


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A production system needs to be upgraded from AIX V5.2 to AIX V5.3. All system logs and users need to be saved.  Which installation method will accomplish the upgrade()
    A

    Update Installation

    B

    Migration Installation

    C

    Preservation Installation

    D

    Mirror rootvg prior to a Preservation Installation


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
    A

    Use alt_disk_install

    B

    Backup image to NIM server

    C

    Backup using mksysb to DVD-RAM

    D

    Apply the upgrade and do not commit


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()
    A

    Use base media to restore system to AIX 5.1.

    B

    Use an alt_disk_install and boot back to the AIX 5.1 rootvg.

    C

    Make a mksysb of the original AIX to restore back to the AIX 5.1 level.

    D

    Perform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    Which installation method enables the quickest recovery in the event of failure when upgrading from AIX 5.3 to AIX 6.1?()
    A

    Use alt_disk_install.

    B

    Apply the upgrade without commit.

    C

    Use a backup image from a NIM server.

    D

    Use a mksysb image from a locally attached DVD-RAM.


    正确答案: D
    解析: 暂无解析