第1题:
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()
第2题:
Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()
第3题:
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
第4题:
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
第5题:
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
第6题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第7题:
A shared pool with four capped LPARs
A shared pool with four uncapped LPARs
Four dedicated LPARs and use DLPAR to manage resources effectively
The server in SMP mode and use WLM to manage resources effectively
第8题:
contact an IBM Customer Engineer
send a Service Support Representative (SSR)
recommend purchase of a Support Line contract
engage a Field Technical Sales Support (FTSS)
第9题:
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第10题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第11题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第12题:
The p5 595 would allow for COD
The p5 595 includes the Advanced Power Virtualization hardware and software
The p5 595 is priced the same as the p5 590 given the same number/type of CPUs
The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
第13题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第14题:
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()
第15题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第16题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第17题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第18题:
Sum of SPECfp values
Sum of rPerf values only
Sum of rPerf and ROLTP values
Sum of SPECint and SPECjbb values
第19题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第20题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第21题:
Supportline
ServiceSuite
Software Maintenance Agreement (SWMA)
Machine Control Program Remote Support Agreement (MCPRSA)
第22题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第23题:
Loadleveler
AIX Workload Manager
Partition Load Manager
Tivoli Provisioning Manager