Activate the Trial COD for the processors and run a test to verify outcome
Activate the On/Off COD for the processors and run a test to verify outcome
Use rmss to simulate the processor workload and run a test to verify outcome
Use rmps to simulate the processor workload and run a test to verify outcome
第1题:
Companycom is purchasing a p5 595 as part of a large server consolidation. They are planning on using micropartitioning and Virtual IO to consolidate small machines. They used the rPerf numbers for AIX 5.3 to size their solutions. They discovered that their application is not yet certified on AIX 5.3, so they will have to use AIX 5.2. What changes should be made to their configuration?()
第2题:
A frustrated and angry customer calls in with a system that does not work. Which of the following is the FIRST course of action for a technician to take?()
第3题:
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()
第4题:
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
第5题:
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
第6题:
Telnet into the machine and do a shutdown -Fr
Log into ASMI as Administrator and use ASMI menus
Log into the service processor using WebSM and use ASMI menus
Use the off button which is located to the left below the LEDs
第7题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第8题:
From the HMC
From a NFS mount
From a FTP server
From any CD or DVD drive on another server
第9题:
Use shared memory and semaphores to transfer the data to the TSM LPAR
Provide gigabit Ethernet adapters in each LPAR and run a crossover cable
Create a Virtual Ethernet between the production server and the TSM LPARs
Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
第10题:
The socket size does not match
The cache is from a different manufacturer
The processors do not match
Processors cannot be upgraded after server has been deployed
第11题:
Allocate the CD to the VIO Server and NFS export the CD to the user LPARs
Allocate the CD to one of the user LPARs and config the VIO Server to NFS import it
Allocate the CD to the VIO Server and the LPARs will share it as a Virtual SCSI device
Allocate the CD to one of the user LPARs and NFS export it to the remaining user LPARs
第12题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第13题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第14题:
A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()
第15题:
A company wants to run multiple applications on an x445 to serve their user base. OS and application licensing cost is a factor. Which TWO questions will help the specialist decide on the operating environment and the number of processors per server?()
第16题:
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()
第17题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第18题:
Increase memory
Add more adapters
Increase both processors and adapters
Increase the number of processors by 20 - 30%
第19题:
Capped and with a lower share
Uncapped and with a lower share
Uncapped and with a higher share
Capped and with no change in share
第20题:
The socket size does not match
The cache is from a different manufacturer
The processors do not match
Processors cannot be upgraded after server has been deployed
第21题:
Transfer the customer to another technician, who can allocate more time to the issue.
Maintain a positive attitude and offer them the cheapest solution possible to satisfy them.
Listen to what the customer has to say and calmly recommend the best course of action.
Use technical language to demonstrate knowledge and expertise to the customer.
第22题:
Dynamic LPAR
Workload Manager
Partition Load Manager
Shared Processor Pools
第23题:
Enable SMT
Reduce the weight
Renice the process
Increase the weight