第1题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第2题:
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()
第3题:
A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()
第4题:
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()
第5题:
Assign the adapters to a Virtual IO partition
Use the MPIO function included in AIX 5.2
Migrate the application to AIX 5.3 and use the MPIO function
Set up two Virtual IO partitions and attach both partitions to the device
第6题:
LPAR capacity planning
logical volume configuration
data migration process
audit hosts for HBA worldwide port names
第7题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第8题:
Higher rack density that reduces data center footprints
Internal upgrades that only IBM can offer
Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches
The Rear Door Heat eXchanger that only IBM can offer
第9题:
What is the planned backup solution?
How many people manage the storage system?
What is the total planned capacity?
Is a shared storage subsystem under consideration?
第10题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager
第11题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第12题:
Perform a full system backup.
Follow up with the customer, verifying satisfaction.
Ask their manager to contact the customer.
Perform a complimentary virus scan.
第13题:
The sales team has just sold the first pSeries solution to a Windows NT customer. The team has identified concerns with a non-existent backup strategy and some workable environmental issues. In addition to these concerns,what other major concern should be considered?()
第14题:
A customer has Direct Attached Storage (DAS) storage for their Windows servers. They are allocating money in next year’s budget for additional storage. Which of the following questions should be asked first to determine the proper storage solution to propose?()
第15题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第16题:
Who recommended the memory purchase?
Have more users been added since the memory purchase?
Why were additional CPUs not ordered at the same time as the memory?
Did a performance analysis of peak periods show a memory bottleneck?
第17题:
Implementing CoD
Using Express Configurations with processor upgrades
Meeting the minimum Value Pak rules
Engaging the pSeries representative to identify appropriate discounts
第18题:
A DS4000 SAN with flash copy enabled for volume mirroring
An iSCSI solution with dedicated backup server with SCSI attached tape library
A NAS solution with SCSI direct attached tape library with dedicated backup network
A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
第19题:
Customer skill level
Hardware availability
Lack of executive sponsorship
Hardware and software compatibility
第20题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第21题:
Amount of data in the backup
Bandwidth available to the tape device
Length of the backup/restore window
Speed that the backup system can find files for restoration
第22题:
The IBM CE will install the card
The card will not be supported by IBM
The AIX device driver should work fine
The customer is correct, there should be no problem
第23题:
the number of SAN ports required by the solution
thin provisioning is mandatory
the solution needs to support RAID 0