Run the test and dev LPARs in an uncapped mode
Activate COD resources if a failover should occur
Use DLPAR to move resources between the test and dev and the HACMP LPAR
Stop the test and dev environments, bring up new profile for HACMP failover
第1题:
Company.com is planning for an HACMP cluster and wants to know more about the network requirements. The plan is to use IPAT via IP aliasing and heartbeating via IP aliasing to preserve the corporate IP addresses. Currently the customer uses a separate VLAN for each individual subnet. Which statement best describes how HACMP co-exists with VLAN’s in this configuration?()
第2题:
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
第3题:
A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()
第4题:
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()
第5题:
Company.com has two sites that are 3072 kilometers apart and wants to implement HACMP between eh two locations. The nodes at each location must be capable of running the application in the event of a failure. Currently the customer’s disk technology is SCSI. How can HACMP be used in this environment?()
第6题:
Your network consists of a single Active Directory site that includes two network segments. Thenetwork segments connect by using a router that is RFC 1542 compliant. You plan to use Windows Deployment Services (WDS) to deploy Windows Server 2008 R2 servers. All new servers support Pre-Boot Execution Environment (PXE). You need to design a deployment strategy to meet the following requirements: èSupport Windows Server?2008 R2 èDeploy the servers by using WDS in both network segments èMinimize the number of servers used to support WDS What should you include in your design?()
第7题:
Shared Ethernet Adapters and Virtual SCSI services require separate Virtual IO Servers.
Virtualized adapters require essentially the same Virtual IO Server resources regardless of adapter type.
Shared Ethernet Adapters require significantly more Virtual IO Server resources than Virtual SCSI services.
Virtual SCSI services require significantly more Virtual IO Server resources than Shared Ethernet Adapters.
第8题:
All subnets in use by HACMP must be in the same VLAN.
All subnets in sue by HACMP must be in a different VLAN.
HACMP does not support multiple subnets when using heartbeating via IP aliasing.
HACMP does not support the use of VLAN.
第9题:
Emulate the errpt entry from the HACMP Error Notification menu
Execute a custom test procedure from the HACMP Cluster Test Tool menu
Emulate the LVM_SA_QUORCLOSE event from the HACMP Event Emulation menu
Execute the automated test procedure from the HACMP Cluster Test Tool menu
第10题:
Run the test and dev LPARs in an uncapped mode
Activate COD resources if a failover should occur
Use DLPAR to move resources between the test and dev and the HACMP LPAR
Stop the test and dev environments, bring up new profile for HACMP failover
第11题:
Execute lssrc -g cluster stop on Node ’A’
Execute cat /etc//motd >/dev/kmem on Node ’A’
Execute /usr/es/sbin/cluster/utilities/sclstop -gr on Node ’A’
Find the pid of cluster manager daemon on Node ’A’ and issue a kill-9 against the pid
第12题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第13题:
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
第14题:
Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()
第15题:
A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’. Which of the following is the best way to execute this portion of the test plan?()
第16题:
An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?()
第17题:
A customer wants to directly attach five servers to an IBM System Storage DS8100. They do not intend to use any SAN switches and would like the servers to have a redundant connection to the IBM DS8100. What is the minimum number of DS8000 host adapter cards that the customer will require()
第18题:
Use nodes of equal size.
Create multiple resource groups and use loadlever.
Use dynamic node priority to manage resource groups.
Use an ordered list to manage resource group fallover.
第19题:
Set up the server in SMP mode and use WLM to manage resources effectively
Set up eight dedicated LPARs and use DLPAR to manage resources effectively
Set up a shared pool with eight capped LPARs including production and test/dev
Set up a shared pool with eight uncapped LPARs with priority weight to Production
第20题:
Run the test and dev LPARs in an uncapped mode
Activate COD resources if a failover should occur
Use DLPAR to move resources between the test and dev and the HACMP LPAR
Stop the test and dev environments, bring up new profile for HACMP failover
第21题:
Use the logform command to format /dev/fs1log as a jfslog
Use the chlv command to change the lv type of /dev/fs1log to jfslog
Use the chvg command to change the default jfslog of testvg to /dev/fs1log
Edit the /etc/filesystems file to change the log associated with /test/fs1 to /dev/fs1log
第22题:
HACMP cannot span sites; the environment must be contained in a single site.
HACMP/XD://HAGeo has unlimited distance mirroring that may be appropriate for this environment.
HACMP cannot be split into two sites that exceed the limitation s of the storage cable length.
HACMP/XD://PPRC that is included with the base HACMP distribution will enable site-to-site communications in HACMP.
第23题:
Apply OS updates once a year
Utilize a GPFS cluster solution
Implement a two server deployment with HACMP
Install a single server implementation with HACMP failover to a second LPAR
第24题:
2
4
6
8