A SAN device
First I/O drawer
Any I/O drawer within the main frame
First I/O drawer within the expansion frame
第1题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第2题:
Which of the following phrases is TRUE regarding monitoring disk I/O with iostat?()
第3题:
A specialist is monitoring performance on a server. The data is on another partition within the same array as the OS. The following information is available: (1)The average record written to disk is 16KB (2)The I/O block size is 2KB (3)The stripe size on the RAID array is 16KB Which of the following will improve performance without rebuilding the operating system?()
第4题:
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
第5题:
Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()
第6题:
Add the devices as virtual adapters to a VIO server first,then add the I/O drawer and create the shared ethernet adapters
Power down the partitions,run the diag a command when the system is brought back up and reconfigure the network cards
Use the rmdev command to remove the devices,shut down the partitions and move the cads,then run the cfgmgr command after reboot
Detach the network cards,run rmdev on the devices and then dynamically reassign theadapters to the partitions and reconfigure
第7题:
When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware.
V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions.
When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.
V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
第8题:
A second IVE adapter
A second processor card
PowerVM Enterprise Edition
An additional cable-management arm
第9题:
Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.
Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.
Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.
Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.
第10题:
The iostat can only be run as the root user
There could be zero percent I/O wait and still be an I/O bottleneck
Any I/O wait time displayed in output of iostat is an indication of severe I/O bottlenecks
Running iostat without any arguments/parameters is sufficient for resolving I/O bottlenecks
第11题:
Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.
Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.
Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.
第12题:
A SAN device
First I/O drawer
Any I/O drawer within the main frame
First I/O drawer within the expansion frame
第13题:
When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()
第14题:
A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment. Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()
第15题:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第16题:
A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
第17题:
Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?()
第18题:
I/O Planning Guide
Power Systems data sheet
Power Systems Facts and Features
Run FLRT to recommend I/O features
第19题:
Islv
vmstat
iostat
Ivmstat
第20题:
Boot the HMC with the VIOS media.
Assign SAN-attached disks to the database partitions.
Create logical volumes for the VIOS on rootvg disks.
Identify the location of the internal SCSI disks for the VIOS.
第21题:
lslv
lsvg
iostat
lvmstat
第22题:
Create and install the NIM server
Create and install the Virtual I/O Server
Create and install the application servers
Activate Advanced POWER Virtualization
第23题:
additional installation of the first and second expansion frame will increase the backend performance capability
the usage of 300 GB/15k FC disks will give the server a high-performance backend capability
performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disks
the second RIO-G loop between the base frame and the first expansion increases the backend performance
第24题:
Change the I/O block size to match the RAID Stripe size.
Change the RAID stripe size to match the I/O block size.
Change the record size of the database to match the RAID stripe size.
Change the record size of the database to match the I/O transfer rate.