单选题A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups.

题目
单选题
A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows server at the main site with a server at the DR site with a minimal amount of downtime.  Which method will achieve their goals()
A

locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server

B

create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server

C

shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server

D

recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server


相似考题
参考答案和解析
正确答案: B
解析: 暂无解析
更多“单选题A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups.”相关问题
  • 第1题:

    A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()

    • A、Global Mirror for zSeries
    • B、Metro Mirror
    • C、Global Copy
    • D、Metro/Global Mirror

    正确答案:B

  • 第2题:

    A customer is sharing an IBM System Storage DS8300 for both IBM System z and Systemapplications. They need to provide data recovery capability between the primary and the remotedata center, which is 60 kilometers away. Which copy service keeps all data synchronized at theremote data center?()

    • A、Concurrent Copy
    • B、FlashCopy
    • C、Metro Mirror
    • D、Global Mirror

    正确答案:C

  • 第3题:

    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()

    • A、bring up the secondary site on the target disks
    • B、suspend and bring up the secondary site on the target disks
    • C、perform a FlashCopy and bring up the secondary site on the target disks
    • D、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks

    正确答案:D

  • 第4题:

    A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()

    • A、System Storage Productivity Center
    • B、Tivoli Storage Productivity Center for Data
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Fabric

    正确答案:C

  • 第5题:

    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()

    • A、compatibility of copy functions
    • B、difference in capacities in the two systems
    • C、cache size discrepancies between the two systems
    • D、the necessity of using two storage management products

    正确答案:A

  • 第6题:

    A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited.  Which solution best meets the specified requirements()

    • A、two IBM System Storage DS8100 systems
    • B、one IBM System Storage DS8300 with LPAR
    • C、two IBM System Storage DS6800 systems in a single rack
    • D、one IBM System Storage DS6800

    正确答案:B

  • 第7题:

    A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows server at the main site with a server at the DR site with a minimal amount of downtime.  Which method will achieve their goals()

    • A、locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server
    • B、create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server
    • C、shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server
    • D、recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server

    正确答案:B

  • 第8题:

    单选题
    A customer wants to collect performance data from a newly installed IBM System Storage DS8300 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()
    A

    IBM DS Storage Manager

    B

    IBM Tivoli Storage Resource Manager

    C

    IBM TotalStorage Productivity Center for Disk

    D

    IBM TotalStorage Productivity Center for Data


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
    A

    bring up the secondary site on the target disks

    B

    suspend and bring up the secondary site on the target disks

    C

    perform a FlashCopy and bring up the secondary site on the target disks

    D

    go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()
    A

    install FlashCopy on the DS8100 

    B

    install SAN Volume Controllers with FlashCopy

    C

    install SAN Volume Controllers with Metro Mirror 

    D

    install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
    A

    Global Copy

    B

    Metro Mirror

    C

    Global Mirror

    D

    Metro/Global Mirror


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()
    A

    Two IBM System Storage DS8100 systems

    B

    One IBM System Storage DS8300 with two LPARs

    C

    Two IBM System Storage DS6800 systems in a single rack

    D

    One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A customer wants to collect performance data from a newly installed IBM System Storage DS8700 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()

    • A、IBM DS Storage Manager
    • B、Tivoli Storage Resource Manager
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Data

    正确答案:C

  • 第14题:

    A customer is implementing a new streaming audio application and has requested a storageresource management product that will provide performance metrics for their IBM System StorageDS5100. The requirements are for controller read rates as well as controller data rate, amongothers. What IBM storage resource management tool would a technical specialist recommend?()

    • A、Tivoli Storage Productivity Center for Data
    • B、Tivoli Storage Productivity Center Basic Edition
    • C、Tivoli Storage Productivity Center for Data Midrange Edition
    • D、Tivoli Storage Productivity Center for Disk Midrange Edition

    正确答案:D

  • 第15题:

    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()

    • A、Metro/Global Mirror
    • B、Metro Mirror
    • C、Global Copy
    • D、Global Mirror

    正确答案:D

  • 第16题:

    An international company has a heterogeneous IBM storage environment with two IBM DS8700 systems in a Metro Mirror relationship. They also have a virtualized environment with two SVC clusters in a Global Mirror relationship. The storage administrator complains about the monitoring of copy services.  Which solution should the IBM storage specialist propose for this pain point()

    • A、System Storage Productivity Center
    • B、Tivoli Storage Productivity Center for Replication
    • C、Tivoli Storage Productivity Center for Disk
    • D、DS8000 Storage Manager

    正确答案:B

  • 第17题:

    A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()

    • A、install FlashCopy on the DS8100 
    • B、install SAN Volume Controllers with FlashCopy
    • C、install SAN Volume Controllers with Metro Mirror 
    • D、install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 

    正确答案:C

  • 第18题:

    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()

    • A、Global Copy
    • B、Metro Mirror
    • C、Global Mirror
    • D、Metro/Global Mirror

    正确答案:C

  • 第19题:

    单选题
    A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows server at the main site with a server at the DR site with a minimal amount of downtime.  Which method will achieve their goals()
    A

    locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server

    B

    create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server

    C

    shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server

    D

    recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited.  Which solution best meets the specified requirements()
    A

    two IBM System Storage DS8100 systems

    B

    one IBM System Storage DS8300 with LPAR

    C

    two IBM System Storage DS6800 systems in a single rack

    D

    one IBM System Storage DS6800


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer is sharing an IBM System Storage DS8300 for both IBM System z and Systemapplications. They need to provide data recovery capability between the primary and the remotedata center, which is 60 kilometers away. Which copy service keeps all data synchronized at theremote data center?()
    A

    Concurrent Copy

    B

    FlashCopy

    C

    Metro Mirror

    D

    Global Mirror


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()
    A

    Metro/Global Mirror

    B

    Metro Mirror

    C

    Global Copy

    D

    Global Mirror


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()
    A

    compatibility of copy functions

    B

    difference in capacities in the two systems

    C

    cache size discrepancies between the two systems

    D

    the necessity of using two storage management products


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()
    A

    Global Mirror for zSeries

    B

    Metro Mirror

    C

    Global Copy

    D

    Metro/Global Mirror


    正确答案: B
    解析: 暂无解析