the number of SAN ports required by the solution
thin provisioning is mandatory
the solution needs to support RAID 0
the solution needs to be supported by the VMware Site Recovery Manager
第1题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第2题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第3题:
The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()
第4题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第5题:
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()
第6题:
customer must reconfigure aniSCSI port for mirroring
customer must set up a fabric and dedicate port 4 for disaster recovery
customer must set up a fabric and dedicate port 2 for disaster recovery
replication is not possible with the DS5020, they must consider the DS5300
第7题:
Two dual-port PCIe adapters
A four-port PCIe Ethernet adapter
Four separate PCIe Ethernet adapters
Two embedded Integrated Virtual Ethernet adapters (IVE)
第8题:
LPAR capacity planning
logical volume configuration
data migration process
audit hosts for HBA worldwide port names
第9题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第10题:
A TDA are recommended only for high end hardware and very large or complex business opportunities
A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirements
A TDA will guarantee that the hardware will work in customer’s environment at the volumes projected
A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software
第11题:
TDA
Capacity Magic
business case review
SAN configuration review
第12题:
DS8800 system with three frames
DS8800 system with one frame
DS8700 system with two frames
DS8800 system with two frames
第13题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第14题:
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
第15题:
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()
第16题:
A UNIX customer has a Symmetrix DMX that has crashed three times in the past six months, causing data loss. The customer is shopping for an enterprise storage solution to provide point-in- time copy functionality without a fixed relationship to its primaries. Which IBM solution best meets this customer’s requirements()
第17题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第18题:
installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan
provision of information regarding customer-specified design requirements and configuration
the migration of network services from an existing state to a future state in accordance with the migration plan
the provision of an objective means of measuring system operability and functionality
第19题:
mksysb
restvg
AIX install CDs
Veritas NetBackup
第20题:
IBM System Storage DS8700 andVolumeCopy
IBM System Storage DS8700 andFlashCopy
IBM System Storage DS8700 andFlashCopy with the NoCopy option
IBM System Storage DS8700 andFlashCopy with the Persistent option
第21题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第22题:
SAN
NAS
SCSI
iSCSI
第23题:
DS8000 model conversions are generally non-disruptive
a model conversion from DS8100 to DS8700 is disruptive
the DS8100 base frame needs to be sent back to the factory for upgrade
during model conversion the logical configuration can be kept, but the system must be rebooted