第1题:
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()
第2题:
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
第3题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第4题:
A customer with an IBM SAN Volume Controller attached to Windows servers calls their BusinessPartner storage specialist asking for configuration assistance. What is the appropriate response?()
第5题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第6题:
The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()
第7题:
Design the solution and present it confidently so the customer does not question it.
Design the solution and ensure the customer understands the unknowns with the new technology.
Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
第8题:
Contact the IBM FTSS to replace the drive
Contact the IBM CSR or SSR to replace the drive
Order a replacement drive
Contact IBM Service
第9题:
IBM Hardware Standard Warranty
Techline
Tivoli Problem Resolution Manager(TPRM)
RTS
第10题:
operator training
cache size of the two clusters
fibre bandwidth capability between the sites
number of stacked tape drives attached to each cluster
第11题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager
第12题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第13题:
A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()
第14题:
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
第15题:
A new IBM x 3650 M3 customer has experienced support issues with problem resolution from their previous vendor. The biggest problem was with Microsoft applications failing intermittently. Which of the following IBM products covers this issue?()
第16题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第17题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第18题:
A current System z customer has 10,000 IBM 3490 tape cartridges, most of which are only 10%utilized, in their tape shelf storage adjacent to the computer room. The customer currently has nospace for the new DS8700 that is on order. What should the IBM storage specialist propose as asolution?()
第19题:
Remote Supervisor Adapter II (RSA II Slimline)
Management Module, which comes standard on the BladeCenter
Acoustic Attenuation Module
Ethernet NICs
第20题:
The business partner was required to perform a TDA and failed to do so
The business partner recommended a nonworking configuration
The business partner did not support the customer correctly
The business partner failed to sell Remote Technical Support (RTS)
第21题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第22题:
Recommend the customer call EMC.
Recommend the customer call IBM hardware support.
Recommend the customer contact SupportLine.
Recommend the customer re-creates the volume groups.
第23题:
IBM Information Archive
TS3500 with LTO-5 drives
TS7700 Virtual Tape Server
TS3310 with two expansion frames
第24题:
Perform a full system backup.
Follow up with the customer, verifying satisfaction.
Ask their manager to contact the customer.
Perform a complimentary virus scan.