第1题:
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
第2题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第3题:
A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers. Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server. They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution. The customer’s top priorities are performance, cost, and availability. Which of the following backup solutions best satisfies the customer requirements?()
第4题:
A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()
第5题:
A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()
第6题:
Add External Storage via EXP3000
Replace current storage with more dense drives
Add External Storage via SAN
Add storage expansion blade
第7题:
Two p670 servers
Four p650 servers
Two p5-570 servers
Four p5-550 servers
第8题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第9题:
Create a new scope for the DNS servers.
Create a reservation for the DHCP serve.
Configure the 005 name servers scope option.
Configure an exclusion that contains the ip addresses of the four DNS servers.
第10题:
Verify uninterruptible power supply (UPS) load
Verify if server consumes 220V
Verify CPU load
Verify if server consumes 110V
第11题:
What is the minimum critical backup window?
Which server is handling the most critical data?
How much data is stored on each server?
What is the throughput of the hard drives?
第12题:
Try to sell IBM X-Architecture technology to the customer and explain its benefits.
Take the customer to the Dell Web site for determining a similar server configuration.
Submit a special bid to receive additional discount on 1U servers.
Design a comparable solution while highlighting IBM advantages.
第13题:
Machine policy templates can be assigned based on certain attributes of a machine. A customer organizes their machines based on the following requirements: The machines are all placed in specific Organizational Units in the Active Directory. The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines. The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()
第14题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第15题:
A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()
第16题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第17题:
A customer has reached the cooling limit in his datacenter, but still has room for additional IBM racks and servers. Which allow additinal future sales of the following?()
第18题:
A DS4000 SAN with flash copy enabled for volume mirroring
An iSCSI solution with dedicated backup server with SCSI attached tape library
A NAS solution with SCSI direct attached tape library with dedicated backup network
A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
第19题:
Rear Door HeateXchanger
ActiveEnery Manager(AEM)
Perforated doors
IBM Cool Blue
第20题:
Conduct a TDA
Use IBM System xConfiguratioin and Option Guide (COG)
UsexREF
Conduct aServerProven Opportunity Request for Evaluation (SPORE)
第21题:
Verify uninterruptible power supply (UPS) load
Verify if server consumes 220V
Verify CPU load
Verify if server consumes 110V
第22题:
ToolsCenter
VMware vSphere 4
Tivoli Provisioning Manager (TPM)
Tivoli Storage Manager (TSM)
第23题:
Virtualization
Replace each server with energy efficient servers
Upgrade in place to improve performance
Implement BladeCenter
第24题:
Hostnames
IP Addresses
Machine Group Tag
Active Directory Groups