Systems Management
Grid Computing
Advanced Energy Manager (AEM)
Remote KVM
第1题:
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()
第2题:
Which of the following is the MOST effective method to restrict staff members from accessing a service on a company server?()
第3题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第4题:
A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager. They recently purchased an IBM x346 server for a remote office database project. They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components. Which of the following solutions would accomplish this?()
第5题:
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
第6题:
logical volume sizes
cache usage by application
storage processor utilization
disk capacity needed forFlashCopy
第7题:
Implement ACLs.
Disable accounts for staff members who do not require server access.
Implement anti-spam software on the server.
Implement anti-virus software on the server.
第8题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第9题:
Propose VMware with Linux on Intel as a solution.
Provide a special bid on the System x servers.
Include migration services within the proposal.
Provide a warranty offering with guaranteed fix levels.
第10题:
HMC
DVD-ROM
Tape drive
Network switch
第11题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager
第12题:
Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer
第13题:
Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()
第14题:
A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()
第15题:
A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel. Which of the following should help IBM meet the customer’s requirements?()
第16题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第17题:
A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()
第18题:
Removes the requirement for Intelligent PDUs
Monitor and balance disk speeds according to utilization needs
Is a required element forEnergyStar certification of the server/data center
Monitor and report power and thermal trending to optimize energy consumption Pass Any Exam. AnyTime. - 14 IBM 000-106: Practice Exam
第19题:
Removes the requirement for Intelligent PDUs
Monitor and balance disk speeds according to utilization needs
Is a required element for EnergyStar certification of the server/data center
Monitor and report power and thermal trending to optimize energy consumption
第20题:
Implement ACLs.
Disable accounts for staff members who do not require server access.
Implement anti-spam software on the server.
Implement anti-virus software on the server.
第21题:
Grid Computing
Active Energy Manager
Remote KVM
Systems Management
第22题:
x3950
x3850
x3650
LS41
第23题:
Install an RSA II Slimline card on the IBM server and configure to send email alerts
Enable the IBM management option in Insight Manager
Install and configure a Director agent on the IBM server
Configure the systems management processor on the IBM server