单选题The customer intends to install a 7315-CR2 into a p690 frame.  What should the pSeries technical specialist tell the customer?()A The HMC is a 19 form factor.B The HMC is a 24 form factor.C The HMC requires a 100-120 volt power connection.D The HMC req

题目
单选题
The customer intends to install a 7315-CR2 into a p690 frame.  What should the pSeries technical specialist tell the customer?()
A

The HMC is a 19 form factor.

B

The HMC is a 24 form factor.

C

The HMC requires a 100-120 volt power connection.

D

The HMC requires a 200-240 volt power connection.


相似考题
更多“单选题The customer intends to install a 7315-CR2 into a p690 frame.  What should the pSeries technical specialist tell the customer?()A The HMC is a 19 form factor.B The HMC is a 24 form factor.C The HMC requires a 100-120 volt power connection.D The HMC req”相关问题
  • 第1题:

    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

    • A、An additional switch for the new HMC
    • B、Asynchronous adapters on the new HMC
    • C、The two 570 servers are directly connected to the new HMC
    • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

    正确答案:A

  • 第2题:

    The customer intends to install a 7315-CR2 into a p690 frame.  What should the pSeries technical specialist tell the customer?()

    • A、The HMC is a 19" form factor.
    • B、The HMC is a 24" form factor.
    • C、The HMC requires a 100-120 volt power connection.
    • D、The HMC requires a 200-240 volt power connection.

    正确答案:A

  • 第3题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第4题:

    A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()

    • A、No upgrades are needed.
    • B、Add another 16-port RAN.
    • C、Add an 8-port async adapter.
    • D、Add an additional 128-port adapter.

    正确答案:C

  • 第5题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第6题:

    单选题
    Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
    A

    Order a POWER5 HMC

    B

    Connect to the existing HMC

    C

    Install an 8-port asynchronous card in the managed server to connect to the existing HMC

    D

    Install an additional network card to the existing HMC and connect to the POWER5 service processor


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed.  The specialist discovers that the customer has never updated their VPD.  Which of the following HMC applications is used to gather the current VPD information?()
    A

    Service Processor

    B

    Service Director

    C

    Inventory Scout Services

    D

    Service Focal Point


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()
    A

     To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.

    B

     Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.

    C

     Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the

    D

     Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()
    A

    Explain to the customer that they need an additional HMC for the POWER5 system.

    B

    Obtain a PO from the customer to purchase additional serial connections to the HMC.

    C

    Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.

    D

    Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()
    A

    No upgrades are needed.

    B

    Add another 16-port RAN.

    C

    Add an 8-port async adapter.

    D

    Add an additional 128-port adapter.


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMc  

    B

    Asynchronous adapters on the new HMc

    C

    The two 570 servers are directly connected to the new HMc  

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

    • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
    • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
    • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
    • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

    正确答案:C

  • 第14题:

    Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()

    • A、An administrative VLAN with port 1808
    • B、Port 657 which must remain open to TCP/IP and UDP traffic
    • C、Network addresses are provided by DHCP services on the network
    • D、DHCP on the HMC is required to be on to communicate between LPAR and HMC

    正确答案:B

  • 第15题:

    The account executive is asking about post-sales support for a new p5 HMC.  They need the pSeries technical specialist to configure an HMC with software support for the customer.  Which of the following should the specialist include in the configuration?()

    • A、Supportline
    • B、ServiceSuite
    • C、Software Maintenance Agreement (SWMA)
    • D、Machine Control Program Remote Support Agreement (MCPRSA)

    正确答案:D

  • 第16题:

    The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed.  The specialist discovers that the customer has never updated their VPD.  Which of the following HMC applications is used to gather the current VPD information?()

    • A、Service Processor
    • B、Service Director
    • C、Inventory Scout Services
    • D、Service Focal Point

    正确答案:C

  • 第17题:

    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()

    • A、Explain to the customer that they need an additional HMC for the POWER5 system.
    • B、Obtain a PO from the customer to purchase additional serial connections to the HMC.
    • C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
    • D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

    正确答案:A

  • 第18题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMC

    B

    Asynchronous adapters on the new HMC

    C

    The two 570 servers are directly connected to the new HMC

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
    A

    Implement a proxy server to provide multiple sources to one destination 

    B

    Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 

    C

    Purchase a network hub or switch so both p5 570s can connect to the single HMC 

    D

    Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC.  Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()
    A

    Are there at least ten RS-232 ports available on the HMC?

    B

    Are there at least ten RS-422 ports available on the HMC?

    C

    Are there at least ten RS-232 and two RS-422 ports available on the HMC?

    D

    Are there at least two RS-232 and ten RS-422 ports available on the HMC?


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    The account executive is asking about post-sales support for a new p5 HMC.  They need the pSeries technical specialist to configure an HMC with software support for the customer.  Which of the following should the specialist include in the configuration?()
    A

    Supportline

    B

    ServiceSuite

    C

    Software Maintenance Agreement (SWMA)

    D

    Machine Control Program Remote Support Agreement (MCPRSA)


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
    A

    Order a new HMC to support the p5 system.

    B

    Attach the new p5 system to the existing HMC.

    C

    Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.

    D

    Do nothing.  This system does not require an HMC.


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
    A

    An administrative VLAN with port 1808

    B

    Port 657 which must remain open to TCP/IP and UDP traffic

    C

    Network addresses are provided by DHCP services on the network

    D

    DHCP on the HMC is required to be on to communicate between LPAR and HMC


    正确答案: D
    解析: 暂无解析