The p5-570 offers CoD processors.
The p5-570 requires more rack space than the three p5-520s.
Redundant power is standard on the p5-570 and is optional on the p5-520.
Operating system charges will be less expensive with the p5-520 solution.
第1题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第2题:
The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? () 1. Return a call from customer seeking compatibility information. 2. Configure three p690 servers to be ordered in two weeks. 3. Prepare a POWER5 presentation to give to a customer in two weeks. 4. Configure three p690 servers to be ordered this quarter.
第3题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第4题:
A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()
第5题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第6题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第7题:
The 1-way p615 cannot be upgraded to a 2-way p615.
The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.
The p615 can be upgraded to a POWER5-based processor.
The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.
第8题:
Purchase a 4-way p630 to compensate for not using SMT.
Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.
Purchase the p5-550 server and install AIX 5.2 and enable SMT.
Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
第9题:
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第10题:
Submit an RPO-MES to add the missing 2-way processor card.
Submit an MES order to add the missing 2-way processor card.
Request VPD from the customer and then submit an RPO-MES request.
Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.
第11题:
IBM sales manual
IBM Redbooks Website
IBM eServer p5 and pSeries Qs and As
IBM eServer p5 and pSeries Facts and Features
第12题:
Is the web content static or dynamic information
Consider two servers for redundancy and failover
What is the average CPU utilization of the existing web servers
Will the servers need a SCSI or Fibre Channel storage solution
第13题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第14题:
A customer wants to upgrade their existing 6-way p650 to an 8-way. The installed inventory shows the p650 as only a 4-way. What should the pSeries technical specialist do in order to best correct IBMinventory records? ()
第15题:
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()
第16题:
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
第17题:
A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()
第18题:
4,2,1,3
4,3,1,2
2,4,3,1
2,3,4,1
第19题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第20题:
A
B
C
D
第21题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第22题:
The p5-570 offers CoD processors.
The p5-570 requires more rack space than the three p5-520s.
Redundant power is standard on the p5-570 and is optional on the p5-520.
Operating system charges will be less expensive with the p5-520 solution.
第23题:
PowerHA SystemMirror
Peer to Peer Remote Copy
General Parallel File Systems
Parallel Operating Environment
第24题:
Maintenance savings due to warranty on new machines
Reliability savings of using one machine versus ten
Financial savings due to cash outlays now versus later
Power savings even if the current power usage is unknown