1
2
6
8
第1题:
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()
第2题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第3题:
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()
第4题:
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
第5题:
The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number of KVM Conversion Cable Options (FC 4268) required to complete this installation?()
第6题:
one
three
two
zero
第7题:
Sum of SPECfp values
Sum of rPerf values only
Sum of rPerf and ROLTP values
Sum of SPECint and SPECjbb values
第8题:
Implementing CoD
Using Express Configurations with processor upgrades
Meeting the minimum Value Pak rules
Engaging the pSeries representative to identify appropriate discounts
第9题:
73GB 15k rpm drives
the amount of IOPS per mail box
the number of servers running Exchange
the Jetstress tool to emulate the Exchange environment
第10题:
1
2
6
8
第11题:
IBM BPSO
IBM Partnerline
IBM Distributor
IBM Supportline
第12题:
Sell Sysback
Conduct a SAR
Sell Supportline
Provide a project timeline
第13题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第14题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第15题:
Acustomer has requested an IBM System Storage DS8300 system for a new Exchange 2003 email solution to meet the following requirements: - 20% yearly growth - 25,000 mail boxes - approximately 50/50 mix of read/write operations The storage specialist has used Capacity Magic to calculate a base configuration of 46.7 TB raw capacity, 64 GB cache, and 24 ports for the DS8300. The storage specialist has been asked to model this configuration using the expected workload to verify that it is a viable solution. What is needed to start modeling()
第16题:
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
第17题:
The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()
第18题:
Design the solution and present it confidently so the customer does not question it.
Design the solution and ensure the customer understands the unknowns with the new technology.
Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
第19题:
One fibre channel switch
Two fibre channel switches
Two Ethernet cards
Nothing
第20题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第21题:
Sales Manual
Announcement Letter
POWER4+ p650 Specification Sheet
Site and Hardware Planning Information Manual
第22题:
one
three
two
zero
第23题:
Remove one application server partition and apply its CPU resources to the Web server.
Reassign the CPU from one of the VIO servers and create the new partition.
Add 0.6 CPU to one of the application servers and run the Web service with the application.
Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
第24题:
HMC
DVD-ROM
Tape drive
Network switch