Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第1题:
Which of the following is the MOST important physical consideration when deploying a new server?()
第2题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第3题:
A Dell customer decided to use IBM Director and xSeries to manage their servers. They purchased 10 IBM x336 servers and they already have 75 various Dell servers. Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()
第4题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第5题:
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()
第6题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第7题:
Humidity monitors, Biometrics, and fire suppression
Cooling, rack space, and power requirements冷
Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
Biometrics, fire suppression, and power requirements
第8题:
Blade servers
Rackmount servers
Tower servers
Web servers
第9题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第10题:
Redundant Blowers
Availability of AMD and Intel Processors
Processor density
Advanced Management Module
第11题:
XIV system
DS5300
DS8800
Storwize V7000
第12题:
Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling
Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power
Ensure a 220v power source for the x445 is available for fully redundant power
Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.
Have their Network Operation Staff review and assist connecting the new server to their existing network.
第13题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第14题:
A customer is considering an Intel processor-based blade solution from a competitor. The customer is willing to share only the information that the competitor offers 96 Xeon processors per rack. Which of the following IBM BladeCenter E benefits should the Sales Specialist emphasize first?()
第15题:
A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio. Which IBM server will fit the best for this customer?()
第16题:
A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack. Which IBM server will best fit this customers requirement? ()
第17题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第18题:
Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第19题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第20题:
x3105
x3200
x3400
x3455
第21题:
x3200
x3455
x3550
x3650
第22题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第23题:
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
第24题:
Humidity monitors, Biometrics, and fire suppression
Cooling, rack space, and power requirements
Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
Biometrics, fire suppression, and power requirements