多选题A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()AInstall the exhaust fan on top of the IBM NetBAY 42 Enterpris
题目
多选题
A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()
A
Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling
B
Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power
C
Ensure a 220v power source for the x445 is available for fully redundant power
D
Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.
E
Have their Network Operation Staff review and assist connecting the new server to their existing network.