Download the latest drivers from EMC for Red Hat Advanced Server.
Ensure that the EMC storage server is configured properly and has the latest firmware levels.
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
Ensure that the systems are connected to the EMC SAN controller.
第1题:
A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()
第2题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第3题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()
第4题:
A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
第5题:
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()
第6题:
A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux. They currently need 12TB, but their growth requirements will be tripled in the near future. They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution. A DS4000 series backup solution needs to be included in the design. Which of the following solutions will satisfy these requirements?()
第7题:
Disk Magic
TPC for Data
CLARiiON Procedure Generator
System Storage Interoperability Center
第8题:
MRPDPlus tool
Inventory Services
PCRS6000 Portable Configurator
eConfig - IBM Configurator for e-Business
第9题:
IBM System Storage DS8000: Host Systems Attachment Guide
DS8000 Interoperability Matrix
IBM System Storage DS8000: Introduction and Planning Guide
IBM System Storage Solution Handbook
第10题:
Download the latest drivers from EMC for Red Hat Advanced Server.
Ensure that the EMC storage server is configured properly and has the latest firmware levels.
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
Ensure that the systems are connected to the EMC SAN controller.
第11题:
DS4300 with a switched fabric and an x445 running VMWare ESX server
DS4500 with a switched fabric and an x445 running VMWare ESX server
DS4300 SAN with a switched fabric and an x445 running Microsoft Virtual Server
DS4400 Server with an x445 running Virtuozzo VPS
第12题:
Novell NetWare Cluster Services
Red Hat Enterprise Linux Cluster Suite
Microsoft Windows 2003 Server with MSCS
Microsoft Windows 2003 Enterprise Edition
第13题:
A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()
第14题:
A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure. Which of the following tasks needs to be done to ensure that the solution will work properly?()
第15题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第16题:
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
第17题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第18题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第19题:
Share the data over the Ethernet LAN.
Install the IXA Adapter in the iSeries server.
Install the IXA Adapter in the xSeries server.
Attach both servers to an IXS switch.
第20题:
Ensure that the EMC storage is listed on the IBM Server Proven website
Ensure that the x445 is listed on the EMC Hardware Compatibility website
Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website
Build a proof of concept system at the customer site to demonstrate functionality
第21题:
VNX
VPLEX
V-Series
USP-V
第22题:
N7900
N6040
DS3300
DS3500
第23题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第24题:
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.