Enable using active partition properties with DLPAR
Enter the activation key via the AIX 6.1 command line and reboot AIX
Enter the activation key via the HMC,power cycle the managed system and start the LPAR
Enter the activation key via the HMC,modify the partition profile and restart the LPAR
第1题:
What operating system is required to support Active Memory Expansion?()
第2题:
On the wlse,which of the following tasks must be completed before interference detection can be enabled?()
第3题:
After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()
第4题:
A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs. During month-end processing one partition becomes memory constrained. What can help overcome this situation?()
第5题:
Which of the following uses compression/decompression to increase the memory available for client workloads?()
第6题:
Simultaneous Multithreading (SMT) is enabled in a POWER6 VIO client running AIX 6.1. Which command would be used to disable it after the next operating system reboot is performed? itcert()
第7题:
AIX 6.1
AIX 5.3
Red Hat 10
SUSE LINUX 11
第8题:
Create a VIO server
Modify the LPAR profiles to add a Virtual Ethernet adapter
Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
Buy the Advanced Power Virtualization feature and enter a authorization code at the service processor menu
第9题:
EPLD upgrade, IOS ISSU, FCoE feature enablement, CoPP configuration, and rolling back a checkpoint
EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and ACL capture enablement
EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration and SNMP configuration
EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and write erase
第10题:
Enable using active partition properties with DLPAR
Enter the activation key via the AIX 6.1 command line and reboot AIX
Enter the activation key via the HMC,power cycle the managed system and start the LPAR
Enter the activation key via the HMC,modify the partition profile and restart the LPAR
第11题:
In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.
In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
第12题:
Active Memory Sharing (AMS)
Active Memory Expansion (AME)
Integrated Virtual Memory (IVM)
Memory Capacity on Demand (CoD)
第13题:
In order for DLPAR operations to be possible, the RMC daemons on the Hardware Management Console (HMC) must communicate with the RMC daemons on all of the LPARs involved. How can the RMC daemons be restarted on the HMC, causing the least disruption?()
第14题:
A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()
第15题:
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()
第16题:
What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()?
第17题:
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
第18题:
A server has been having a memory problem. What feature can be used to determine the failing memory module?()
第19题:
When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware.
V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions.
When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.
V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
第20题:
Butt set
Punch down tool
Cable teste
Cable stripper
第21题:
schedo -o smt=0 -p
smtctl -m off -w boot
chdev -l sys0 -a smt=off
echo 0 > /proc/sys/smt_enable
第22题:
schedo -o smt=0 -p
smtctl -m off -w boot
chdev -l sys0 -a smt=off
echo 0 > /proc/sys/smt_enable
第23题:
128M
256M
512M
1024M
第24题:
Run amepat now on all of the existing LPARs.
Run amepat after consolidation on all LPARs.
Run amepat now on all existing LPARs running on the POWER6 servers.
Run amepat now on all existing LPARs running database applications.