IBM DS5000 Cabling Tool
IBM e-Configurator Tool
IBM Pre-Installation TDA Checklist
IBM Standalone Solutions Configuration Tool
第1题:
An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
第2题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()
第3题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第4题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()
第5题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()
第6题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第7题:
DS5100 and SAN Volume Controller
DS5100 and Tivoli Storage Manager
2 DS5100 systems with Remote Mirroring
DS5100 and Tivoli Storage Productivity Center for Data
第8题:
install the Performance Accelerator feature
review the DS Storage Manager Major Event Log (MEL)
add an expansion frame with additionalFibre Channel ports
review the latest TPC for Disk study to identify the source of the performance issue
第9题:
DS3300 iSCSI-based solution
One MegaRAID 8480 card with four EXP3000 units
DS4000 Fibre Channel solution with EXP810 expansion units
DS3400 Fibre Channel solutionWArialZ
第10题:
IBM DS5000 Cabling Tool
IBM e-Configurator Tool
IBM Pre-Installation TDA Checklist
IBM Standalone Solutions Configuration Tool
第11题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第12题:
add an expansion frame with additionalFibre Channel ports
increase the amount of storage by 20 TB
conduct a Disk Magic study to identify the source of the performance issue
add additionalFibre Channel ports to the existing DS8700
第13题:
A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()
第14题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第15题:
A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()
第16题:
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
第17题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第18题:
An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN. What should the System x Sales Specialist recommend? ()
第19题:
the XIV system can be scaled by the addition of modules
XIV offers thin provisioning for all available host operating systems
reduced operating costs will pay for another XIV system in less than two years
the management GUI allows the administrator tovirtualize the entire storage system quickly
第20题:
TCOnow
Disk Magic
Capacity Magic
System Storage Productivity Center (SSPC)
第21题:
Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第22题:
perform a Disk Magic study
review eConfig with a technical specialist
confirm that the customer has enough ports available in the SAN infrastructure
submit configuration to IBM System Storage Interoperability Center for validation
第23题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第24题:
System Storage Productivity Center
Tivoli Storage Productivity Center for Data
Tivoli Storage Productivity Center for Disk
Tivoli Storage Productivity Center for Fabric