单选题A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()A Providing tools to plan, monitor, manage, and reduce power consumption.B Reduci

题目
单选题
A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()
A

Providing tools to plan, monitor, manage, and reduce power consumption.

B

Reducing cooling requirements by running CPUs at lower speeds.

C

Using smart system design to create high-power servers.

D

Adapting existing solutions like the Rear Door eXpander.


相似考题
更多“单选题A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()A Providing tools to plan, monitor, manage, and reduce power consumption.B Reduci”相关问题
  • 第1题:

    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

    • A、e-Config
    • B、System Planning Tool (SPT)
    • C、IBM Workload Estimator (WLE)
    • D、IBM Performance Monitor (PM)

    正确答案:B

  • 第2题:

    A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()

    • A、Create a 32-core shared processor pool for the DB2 partitions.
    • B、Limit the number of virtual processors on each DB2 partition to 32.
    • C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
    • D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.

    正确答案:A

  • 第3题:

    A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()

    • A、Active Energy Manager
    • B、PowerVM Energy Manager
    • C、Power and Energy Manager
    • D、Thermal and Energy Manager

    正确答案:A

  • 第4题:

    A customer runs an application on a supported 8-way x445.  The customer needs to monitor operations and wants to be alerted when problems arise.  Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()

    • A、Fan operation
    • B、Bottleneck analysis
    • C、Power supply operations
    • D、Planned versus unplanned outages
    • E、Application predictive failure analysis

    正确答案:A,C

  • 第5题:

    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()

    • A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.
    • B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.
    • C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.
    • D、The blade servers do not work with the Optical Pass-Thru Module.

    正确答案:B

  • 第6题:

    单选题
    What does the “writer say about customer loyalty in the first paragraph?
    A

    Business executives need to know how to generate customer loyalty.

    B

    Many executives believe more investment in customer loyalty means more profit.

    C

    It is necessary for companies to generate customer loyalty at all costs.

    D

    Customer loyalty will for sure help corporations make more money.


    正确答案: D
    解析:
    第一段第三句指出“Win loyalty, therefore, and profits will follow…”,随后第五行提到“…many business executives agree”,与选项B(很多总裁相信对顾客忠诚度投资越多利润就越多)表达内容相符。

  • 第7题:

    单选题
    The customer is looking for a tiered storage solution that allows them to manage different types ofdata within the same system. Further questioning reveals that the reason the customer wants amulti-tiered environment is based on cost. Which IBM single tier solution can provide an enterpriselevel system at a midrange cost?()
    A

    XIV system 

    B

    TS3500 

    C

    DS8700 

    D

    DS5300


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Your customer wants to make sure that there are not going to be compatibility issues between a third party HBA connecting to their non-IBM Storage device.  What IBM resource would you start with to determine compatibility?()
    A

    IBM Sizing Guides

    B

    IBM Configuration & Options Guide (COG)

    C

    IBM Standalone Solutions Configuration Tool (SSCT)

    D

    IBM ServerProven


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()
    A

    Providing tools to plan, monitor, manage, and reduce power consumption.

    B

    Reducing cooling requirements by running CPUs at lower speeds.

    C

    Using smart system design to create high-power servers.

    D

    Adapting existing solutions like the Rear Door eXpander.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()
    A

    Explain to the customer that they need an additional HMC for the POWER5 system.

    B

    Obtain a PO from the customer to purchase additional serial connections to the HMC.

    C

    Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.

    D

    Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer wants to check whether they have the necessary tools enabled to prevent intrusions andvirus attacks on a Windows Vista workstation. Which of the following tools can be used to display thecurrent configuration? ()
    A

    Security Center

    B

    Event Viewer Security log

    C

    Windows Defender

    D

    Windows Firewall


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
    A

    The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

    B

    The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

    C

    The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

    D

    The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Your customer wants to make sure that there are not going to be compatibility issues between a third party HBA connecting to their non-IBM Storage device.  What IBM resource would you start with to determine compatibility?()

    • A、IBM Sizing Guides
    • B、IBM Configuration & Options Guide (COG)
    • C、IBM Standalone Solutions Configuration Tool (SSCT)
    • D、IBM ServerProven

    正确答案:D

  • 第14题:

    A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()

    • A、use Storage Manager to export the system profile
    • B、create a configuration ineConfig and provide proof of purchase
    • C、use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configuration
    • D、have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration

    正确答案:A

  • 第15题:

    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()

    • A、One 50 GB SATA 1.8 inch SSD
    • B、Two 73GB 10K SAS HDD SFF
    • C、Two 31 GB SATA 2.5 inch SSD
    • D、Two 50GB SATA 1.8 inch SSD

    正确答案:C

  • 第16题:

    A customer feels they are over-provisioning their current storage environment and falling short onperformance requirements. Which IBM solution can best help this customer manage their multi-tiered disk environment more effectively?()

    • A、IBM Systems Director 
    • B、DS8700 with Easy Tier 
    • C、SAN Volume Controller v6.1 
    • D、Advanced Fully Automated Storage Tiering

    正确答案:B

  • 第17题:

    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()

    • A、Explain to the customer that they need an additional HMC for the POWER5 system.
    • B、Obtain a PO from the customer to purchase additional serial connections to the HMC.
    • C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
    • D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

    正确答案:A

  • 第18题:

    单选题
    A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()
    A

    Active Energy Manager

    B

    PowerVM Energy Manager

    C

    Power and Energy Manager

    D

    Thermal and Energy Manager


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()
    A

    Use PC Anywhere over the Ethernet LAN.

    B

    Use RDM and Aurema to manage the systems.

    C

    Connect high-speed modems to each of the systems’ serial ports to use IBM Director.

    D

    Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()
    A

    TCOnow

    B

    Disk Magic 

    C

    Capacity Magic 

    D

    System Storage Productivity Center (SSPC)


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
    A

    Create a 32-core shared processor pool for the DB2 partitions.

    B

    Limit the number of virtual processors on each DB2 partition to 32.

    C

    Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.

    D

    Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    多选题
    A customer runs an application on a supported 8-way x445.  The customer needs to monitor operations and wants to be alerted when problems arise.  Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()
    A

    Fan operation

    B

    Bottleneck analysis

    C

    Power supply operations

    D

    Planned versus unplanned outages

    E

    Application predictive failure analysis


    正确答案: C,B
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()
    A

    You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.

    B

    Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.

    C

    The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.

    D

    The blade servers do not work with the Optical Pass-Thru Module.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
    A

    One 50 GB SATA 1.8 inch SSD

    B

    Two 73GB 10K SAS HDD SFF

    C

    Two 31 GB SATA 2.5 inch SSD

    D

    Two 50GB SATA 1.8 inch SSD


    正确答案: A
    解析: 暂无解析