Providing tools to plan, monitor, manage, and reduce power consumption.
Reducing cooling requirements by running CPUs at lower speeds.
Using smart system design to create high-power servers.
Adapting existing solutions like the Rear Door eXpander.
第1题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第2题:
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
第3题:
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()
第4题:
A customer runs an application on a supported 8-way x445. The customer needs to monitor operations and wants to be alerted when problems arise. Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()
第5题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()
第6题:
Business executives need to know how to generate customer loyalty.
Many executives believe more investment in customer loyalty means more profit.
It is necessary for companies to generate customer loyalty at all costs.
Customer loyalty will for sure help corporations make more money.
第7题:
XIV system
TS3500
DS8700
DS5300
第8题:
IBM Sizing Guides
IBM Configuration & Options Guide (COG)
IBM Standalone Solutions Configuration Tool (SSCT)
IBM ServerProven
第9题:
Providing tools to plan, monitor, manage, and reduce power consumption.
Reducing cooling requirements by running CPUs at lower speeds.
Using smart system design to create high-power servers.
Adapting existing solutions like the Rear Door eXpander.
第10题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第11题:
Security Center
Event Viewer Security log
Windows Defender
Windows Firewall
第12题:
The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.
The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.
The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.
The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.
第13题:
Your customer wants to make sure that there are not going to be compatibility issues between a third party HBA connecting to their non-IBM Storage device. What IBM resource would you start with to determine compatibility?()
第14题:
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()
第15题:
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
第16题:
A customer feels they are over-provisioning their current storage environment and falling short onperformance requirements. Which IBM solution can best help this customer manage their multi-tiered disk environment more effectively?()
第17题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第18题:
Active Energy Manager
PowerVM Energy Manager
Power and Energy Manager
Thermal and Energy Manager
第19题:
Use PC Anywhere over the Ethernet LAN.
Use RDM and Aurema to manage the systems.
Connect high-speed modems to each of the systems’ serial ports to use IBM Director.
Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.
第20题:
TCOnow
Disk Magic
Capacity Magic
System Storage Productivity Center (SSPC)
第21题:
Create a 32-core shared processor pool for the DB2 partitions.
Limit the number of virtual processors on each DB2 partition to 32.
Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.
第22题:
Fan operation
Bottleneck analysis
Power supply operations
Planned versus unplanned outages
Application predictive failure analysis
第23题:
You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.
Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.
The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.
The blade servers do not work with the Optical Pass-Thru Module.
第24题:
One 50 GB SATA 1.8 inch SSD
Two 73GB 10K SAS HDD SFF
Two 31 GB SATA 2.5 inch SSD
Two 50GB SATA 1.8 inch SSD